Curtin University Homepage
  • Library
  • Help
    • Admin

    espace - Curtin’s institutional repository

    JavaScript is disabled for your browser. Some features of this site may not work without it.
    View Item 
    • espace Home
    • espace
    • Curtin Theses
    • View Item
    • espace Home
    • espace
    • Curtin Theses
    • View Item

    Optimum design of open pit mines

    15490_GianniniPhD.pdf (3.170Mb)
    Access Status
    Open access
    Authors
    Giannini, Luciano Mario
    Date
    1990
    Supervisor
    Dr Lou Caccetta
    Type
    Thesis
    Award
    PhD
    
    Metadata
    Show full item record
    School
    Department of Mathematics and Statistics
    URI
    http://hdl.handle.net/20.500.11937/1342
    Collection
    • Curtin Theses
    Abstract

    A fundamental problem in open pit mine planning is that of determining the optimum ultimate pit limits of the mine. These limits are that pit contour which is the result of extracting a volume of material which maximizes the difference between the value of extracted ore and the total extraction cost of ore and waste whilst satisfying certain practical operational requirements, such as. safe wall slopes. The determination of the optimum pit contour provides information which is essential in the evaluation of the economic potential of the mineral deposit.A number of optimization techniques have been proposed for determining the optimum pit contour. Of these techniques, those based on graph theory, linear programming and dynamic programming are mathematically rigorous, but only those based on graph theory are more suited to solving the three-dimensional problem. Unfortunately, direct application of these techniques to large ore- bodies may cause considerable difficulties because of the exceptionally high demand on computer storage and time requirements. Indeed, 25 years of research effort has not satisfactorily resolved these computational problems.A major contribution of the work presented in this thesis is the successful implementation of a system of techniques to solve the graph theoretic model, particularly when applied to large ore- bodies. A measure of this success is the fact that pits, as much as seven times larger may be designed with a given amount of computer storage, at a fraction of the time required by current software packages. The solution strategy presented involves the application of a modified Dinics Maximum Flow algorithm, together with an efficient data reducing technique. Computational results of these techniques applied on data from gold producing mines in Western Australia are used to demonstrate the success of this strategy.The relationships between the rigorous pit optimization techniques are also considered in this work. In particular, the Lerchs-Grossman graph-theoret ic method is shown to be stepwise equivalent to a modified version of the Dual-Simplex Linear Programming technique and not as efficient as the Network Flow method.

    Related items

    Showing items related by title, author, creator and subject.

    • Evaluation of monorail haulage systems in metalliferous underground mining
      Besa, Bunda (2010)
      The decline is a major excavation in metalliferous mining since it provides the main means of access to the underground and serves as a haulage route for underground trucks. However, conventional mining of the decline to ...
    • Graph-induced restricted Boltzmann machines for document modeling
      Nguyen, T.; Tran, The Truyen; Phung, D.; Venkatesh, S. (2016)
      © 2015 Elsevier Inc. All rights reserved. Discovering knowledge from unstructured texts is a central theme in data mining and machine learning. We focus on fast discovery of thematic structures from a corpus. Our approach ...
    • Integration of Synthetic Aperture Radar Interferometry (InSAR) and Geographical Information Systems (GIS) for monitoring mining induced surface deformations
      Zahiri, Hani (2012)
      Surface subsidence induced by mining is a source of risk to people, equipment and environment. It may also disrupt mining schedules and increase the cost of mine safety. To provide accurate assessment of the surface ...
    Advanced search

    Browse

    Communities & CollectionsIssue DateAuthorTitleSubjectDocument TypeThis CollectionIssue DateAuthorTitleSubjectDocument Type

    My Account

    Admin

    Statistics

    Most Popular ItemsStatistics by CountryMost Popular Authors

    Follow Curtin

    • 
    • 
    • 
    • 
    • 

    CRICOS Provider Code: 00301JABN: 99 143 842 569TEQSA: PRV12158

    Copyright | Disclaimer | Privacy statement | Accessibility

    Curtin would like to pay respect to the Aboriginal and Torres Strait Islander members of our community by acknowledging the traditional owners of the land on which the Perth campus is located, the Whadjuk people of the Nyungar Nation; and on our Kalgoorlie campus, the Wongutha people of the North-Eastern Goldfields.