A New Mine Planning Methodology using Topcone Algorithm and Mathematical Programming
Access Status
Open access
Authors
Mai, Ngoc Luan
Date
2017Supervisor
Prof. Erkan Topal
Type
Thesis
Award
PhD
Metadata
Show full item recordFaculty
Science and Engineering
School
Western Australia School of Mines
Collection
Abstract
The PhD study focuses on developing new optimisation models for the open pit mine planning and production scheduling using TopCone Algorithm and mathematical programming techniques. Specifically, TopCone Algorithm is a new block aggregation algorithm formulated to significantly reduce the scale of data fed into downstream mathematical programming-based production scheduling models. In addition, geological uncertainty of mineral deposits is integrated into the optimisation process to minimise its impact on meeting production targets.
Related items
Showing items related by title, author, creator and subject.
-
Srar, Jalal Abdulsayed (2011)In recent years, adaptive or smart antennas have become a key component for various wireless applications, such as radar, sonar and cellular mobile communications including worldwide interoperability for microwave ...
-
Kulanoot, Araya (2000)The Knapsack Problems are among the simplest integer programs which are NP-hard. Problems in this class are typically concerned with selecting from a set of given items, each with a specified weight and value, a subset ...
-
Huo, Jia Q. (1999)Adaptive filters have found applications in many signal processing problems. In some situations, linear constraints are imposed on the filter weights such that the filter is forced to exhibit a certain desired response. ...