Curtin University Homepage
  • Library
  • Help
    • Admin

    espace - Curtin’s institutional repository

    JavaScript is disabled for your browser. Some features of this site may not work without it.
    View Item 
    • espace Home
    • espace
    • Curtin Theses
    • View Item
    • espace Home
    • espace
    • Curtin Theses
    • View Item

    Integrative Trust-Based Functional Contracting: A Complementary Contractual Approach to BIM-Enabled Oil And Gas EPC Project Delivery

    Lee CY 2019.pdf (3.799Mb)
    Access Status
    Open access
    Authors
    Lee, Cen Ying
    Date
    2019
    Supervisor
    Heap-Yih Chong
    Type
    Thesis
    Award
    PhD
    
    Metadata
    Show full item record
    Faculty
    Humanities
    School
    Design and the Built Environment
    URI
    http://hdl.handle.net/20.500.11937/75059
    Collection
    • Curtin Theses
    Abstract

    The research has successfully bridged the gap between contractual and technological practices for the Engineering, Procurement and Construction (EPC) contracts in oil and gas projects. It has identified the related Building Information Modelling (BIM) uses and developed an integrative trust-based functional contracting that complement to EPC contracts. The research contributes to new functional perspectives of contracting and also provides significant insights into the proper use contract functions for improving BIM-enabled projects’ performance.

    Related items

    Showing items related by title, author, creator and subject.

    • Joint Contract-Function Effects on BIM-Enabled EPC Project Performance
      Lee, C.Y.; Chong, Heap-Yih (John) ; Li, Q.; Wang, Xiangyu (2020)
      © 2020 American Society of Civil Engineers. Engineering, procurement, and construction (EPC) contracting does not promote collaboration and thus may not be suitable for building information modeling (BIM) projects. ...
    • The Coordination and Optimization of Closed-Loop Supply Chain with Lots of Factors
      Shi, C.; Zhou, Guanglu; Bian, D.; Wu, M. (2016)
      Consider a closed-loop supply chain including a manufacturer, a retailer and two third party recyclers as the background. A coordination and optimization model is built by using the downside-risk function, Cournot model ...
    • Enhancing BIM Performance in EPC Projects through Integrative Trust-Based Functional Contracting Model
      Lee, Cen-Ying; Chong, Heap Yih; Wang, Xiangyu (2018)
      © 2018 American Society of Civil Engineers. Delivering building information modeling (BIM) requires a certain level of trust to make it more effective. However, the engineering, procurement, and construction (EPC) approach, ...
    Advanced search

    Browse

    Communities & CollectionsIssue DateAuthorTitleSubjectDocument TypeThis CollectionIssue DateAuthorTitleSubjectDocument Type

    My Account

    Admin

    Statistics

    Most Popular ItemsStatistics by CountryMost Popular Authors

    Follow Curtin

    • 
    • 
    • 
    • 
    • 

    CRICOS Provider Code: 00301JABN: 99 143 842 569TEQSA: PRV12158

    Copyright | Disclaimer | Privacy statement | Accessibility

    Curtin would like to pay respect to the Aboriginal and Torres Strait Islander members of our community by acknowledging the traditional owners of the land on which the Perth campus is located, the Whadjuk people of the Nyungar Nation; and on our Kalgoorlie campus, the Wongutha people of the North-Eastern Goldfields.