Stratified Deposit Production Schedule Optimisation Considering In-Pit Dumping and Haul Road Selection
dc.contributor.author | Das, Ranajit | |
dc.contributor.supervisor | Erkan Topal | en_US |
dc.contributor.supervisor | Elham Mardaneh | en_US |
dc.date.accessioned | 2024-05-27T01:27:52Z | |
dc.date.available | 2024-05-27T01:27:52Z | |
dc.date.issued | 2024 | en_US |
dc.identifier.uri | http://hdl.handle.net/20.500.11937/95163 | |
dc.description.abstract |
In mining operations, selecting a schedule for waste mining and hauling to dump locations including in-pit dumps and ore to plants and stockpiles, through a network of roads, poses a huge combinatorial problem. A mathematical model has been proposed to simultaneously optimise pit and waste dump mining including in-pit dumping, with the selection of shortest haulage from possible haul-road networks. Solution methodologies have been developed using exact and meta-heuristic methods and applied on several cases. | en_US |
dc.publisher | Curtin University | en_US |
dc.title | Stratified Deposit Production Schedule Optimisation Considering In-Pit Dumping and Haul Road Selection | en_US |
dc.type | Thesis | en_US |
dcterms.educationLevel | PhD | en_US |
curtin.department | WASM: Minerals, Energy and Chemical Engineering | en_US |
curtin.accessStatus | Open access | en_US |
curtin.faculty | Science and Engineering | en_US |