Show simple item record

dc.contributor.authorZhou, Jingyang
dc.contributor.authorLove, Peter
dc.contributor.authorMatthews, Jane
dc.contributor.authorCarey, Brad
dc.contributor.authorSing, C.
dc.contributor.authorEdwards, D.
dc.date.accessioned2017-01-30T11:18:27Z
dc.date.available2017-01-30T11:18:27Z
dc.date.created2015-12-10T04:25:57Z
dc.date.issued2015
dc.identifier.citationZhou, J. and Love, P. and Matthews, J. and Carey, B. and Sing, C. and Edwards, D. 2015. Toward productivity improvement in electrical engineering documentation. International Journal of Productivity and Performance Management. 64 (8): pp. 1024-1040.
dc.identifier.urihttp://hdl.handle.net/20.500.11937/10378
dc.identifier.doi10.1108/IJPPM-10-2014-0151
dc.description.abstract

Purpose – The purpose of this paper is to determine the unproductive time and additional cost to re-engineer a safety control system for a Floating Production Storage Offloading vessel that was originally engineered and documented in computer-aided design (CAD). Design/methodology/approach – The “As-Built” drawings contained numerous errors and omissions, which resulted in a “requests for information” being raised and productivity rates reduced – these costs and productivity losses are quantified. The use of CAD to originally engineer and document the safety control system was found to be inefficient as a 1:n relationship existed. Systems Information Models (SIMs) presents an alternative method to produce engineering documentation for the safety control system; where a 1:1 relationship is created between the model and the real objects. By constructing a 1:1 model, information redundancy can be eliminated, which reduces the propensity for errors and omissions to be made by engineers. Findings – The use of a SIM to re-engineer and document the new safety control system resulted in significant productivity benefits being achieved. Consequently, it is proffered that a paradigm shift from a 1:n to 1:1 perspective is required for engineering electrical and instrumentation systems so as to ameliorate the quality of documentation produced and productivity. Originality/value – The paper concludes by suggesting that future research is required to examine how processes and procedures can be re-designed to accommodate the use of a SIM.

dc.relation.sponsoredbyhttp://purl.org/au-research/grants/arc/DP130103018
dc.titleToward productivity improvement in electrical engineering documentation
dc.typeJournal Article
dcterms.source.volume64
dcterms.source.number8
dcterms.source.startPage1024
dcterms.source.endPage1040
dcterms.source.issn1741-0401
dcterms.source.titleInternational Journal of Productivity and Performance Management
curtin.departmentDepartment of Construction Management
curtin.accessStatusFulltext not available


Files in this item

FilesSizeFormatView

There are no files associated with this item.

This item appears in the following Collection(s)

Show simple item record