    Moving Beyond Optimism Bias and Strategic Misrepresentation: An Explanation for Social Infrastructure Project Cost Overruns

    Access Status
    Fulltext not available
    Authors
    Love, Peter
    Edwards, D.
    irani, Z.
    Date
    2012
    Type
    Journal Article
    
    Metadata
    Show full item record
    Citation
    Love, P. and Edwards, D. and irani, Z. 2012. Moving Beyond Optimism Bias and Strategic Misrepresentation: An Explanation for Social Infrastructure Project Cost Overruns. IEEE Transactions on Engineering Management. 59 (4): pp. 560-571.
    Source Title
    IEEE Transactions on Engineering Management
    DOI
    10.1109/TEM.2011.2163628
    ISSN
    0018-9391
    School
    Department of Construction Management
    URI
    http://hdl.handle.net/20.500.11937/10679
    Collection
    • Curtin Research Publications
    Abstract

    Infrastructure projects regularly experience cost and schedule overruns. Research led by Flyvbjerg has suggested that misrepresentation and optimism bias are primary causes for overruns. While Flyvbjerg's research has made a significant contribution to ameliorating understanding as to why economic infrastructure projects experience overruns, it does not adequately explain why this is the case for such social infrastructure. In addressing this shortcoming, case studies are used to determine the intermediary events and actions that contributed to project cost overruns. The pathogens, events, and actions that contributed to overruns are identified and analyzed. The analysis of the cases' findings led to the propagation of a nomological framework for social infrastructure project overruns. Acknowledgment of the systemic pathogenic influences has enabled the establishment of an orthodoxy, which provides an impetus for addressing the issues needed to improve the performance of social infrastructure projects.

    Related items

    Showing items related by title, author, creator and subject.

    • PPP Social Infrastructure Procurement: Examining the Feasibility of a Lifecycle Performance Measurement Framework
      Liu, Henry; Love, Peter; Sing, M.; Smith, J.; Matthews, Jane (2016)
      Public-private partnerships (PPPs) have been extensively used to deliver an array of infrastructure projects in Australia; they have become an integral part of several state governments’ procurement strategies. Over the ...
    • Overruns in Transportation Infrastructure Projects
      Love, Peter; Sing, Michael; Wang, Xiangyu; Irani, Z.; Thwala, D. (2014)
      Transportation infrastructure projects are prone to cost and schedule overruns. At the time of contract award, a construction contingency budget is often used to accommodate for unplanned events such as scope changes. ...
    • Cost overruns in transportation infrastructure projects: Sowing the seeds for a probabilistic theory of causation
      Love, Peter; Ahiaga-Dagbui, D.; Irani, Z. (2016)
      © 2016 Elsevier LtdUnderstanding the cause of cost overruns in transportation infrastructure projects has been a topic that has received considerable attention from academics and the popular press. Despite studies providing ...
    Advanced search

    Browse

    Communities & CollectionsIssue DateAuthorTitleSubjectDocument TypeThis CollectionIssue DateAuthorTitleSubjectDocument Type

    My Account

    Admin

    Statistics

    Most Popular ItemsStatistics by CountryMost Popular Authors

    Follow Curtin

    • 
    • 
    • 
    • 
    • 

    CRICOS Provider Code: 00301JABN: 99 143 842 569TEQSA: PRV12158

    Copyright | Disclaimer | Privacy statement | Accessibility

    Curtin would like to pay respect to the Aboriginal and Torres Strait Islander members of our community by acknowledging the traditional owners of the land on which the Perth campus is located, the Whadjuk people of the Nyungar Nation; and on our Kalgoorlie campus, the Wongutha people of the North-Eastern Goldfields.