Curtin University Homepage
  • Library
  • Help
    • Admin

    espace - Curtin’s institutional repository

    JavaScript is disabled for your browser. Some features of this site may not work without it.
    View Item 
    • espace Home
    • espace
    • Curtin Research Publications
    • View Item
    • espace Home
    • espace
    • Curtin Research Publications
    • View Item

    Ventilation circuit for large and gassy longwall panels – an Australian perspective

    Access Status
    Fulltext not available
    Authors
    Halim, Adrian
    Date
    2013
    Type
    Journal Article
    
    Metadata
    Show full item record
    Citation
    Halim, A. 2013. Ventilation circuit for large and gassy longwall panels – an Australian perspective. Mining Technology. 122 (4): pp. 235-242.
    Source Title
    Mining Technology
    DOI
    10.1179/1743286313Y.0000000043
    ISSN
    1474-9009
    URI
    http://hdl.handle.net/20.500.11937/10908
    Collection
    • Curtin Research Publications
    Abstract

    The current trend in Australian longwall mines is to increase panel dimensions and production rate, and mining in gassy regions. However, this trend poses a challenge to provide adequate ventilation to manage gas emissions. While the traditional two heading gateroad bleederless U ventilation circuit, which is the most commonly used circuit in Australia, is no longer suitable due to its low volumetric capacity, a few mines manage to overcome this problem by employing a three heading gateroad ventilation circuit. However, this circuit requires significant additional development, which makes it not popular in Australian coal mines. The aim of this paper is to review the suitability of two heading and three heading gateroad traditional bleederless U ventilation circuits for a large longwall panel mining in gassy conditions. It was found that significant predrainage of the thickest roof seam is required in order to make the two heading gateroad circuit feasible in large and gassy longwall panels.

    Related items

    Showing items related by title, author, creator and subject.

    • Comprehensive and Integrated Mine Ventilation Consultation Model - CIMVCM
      Cheng, Jianwei; Wu, Y.; Xu, H.; Liu, J.; Yang, Y.; Deng, H.; Wang, Y. (2014)
      © 2014 Elsevier Ltd. Since the beginning of mining, the problems induced by ventilation in underground coal mining practices have prompted great needs of reliable consulting tools to assist mining engineers, government ...
    • Classification of Structural Complexity for Mine Ventilation Networks
      Wei, L.; Zhou, F.; Cheng, Jianwei; Luo, X.; Li, X. (2015)
      © 2015 Wiley Periodicals, Inc. The mine ventilation system is most important and technical measure for ensuring safety production in mines. The structural complexity of a mine ventilation network can directly affect the ...
    • Classification of Structural Complexity for Mine Ventilation Networks
      Wei, L.; Zhou, F.; Cheng, Jianwei; Luo, X.; Li, X. (2015)
      © 2015 Wiley Periodicals, Inc. The mine ventilation system is most important and technical measure for ensuring safety production in mines. The structural complexity of a mine ventilation network can directly affect the ...
    Advanced search

    Browse

    Communities & CollectionsIssue DateAuthorTitleSubjectDocument TypeThis CollectionIssue DateAuthorTitleSubjectDocument Type

    My Account

    Admin

    Statistics

    Most Popular ItemsStatistics by CountryMost Popular Authors

    Follow Curtin

    • 
    • 
    • 
    • 
    • 

    CRICOS Provider Code: 00301JABN: 99 143 842 569TEQSA: PRV12158

    Copyright | Disclaimer | Privacy statement | Accessibility

    Curtin would like to pay respect to the Aboriginal and Torres Strait Islander members of our community by acknowledging the traditional owners of the land on which the Perth campus is located, the Whadjuk people of the Nyungar Nation; and on our Kalgoorlie campus, the Wongutha people of the North-Eastern Goldfields.