Artificial Neural Networks Incorporating Cost Significant Items towards Enhancing Estimation for (life-cycle) Costing of Construction Projects
Access Status
Authors
Date
2013Type
Metadata
Show full item recordCitation
Source Title
ISSN
Remarks
This article is published under the Open Access publishing model and distributed under the terms of the Creative Commons Attribution License http://creativecommons.org/licenses/by/4.0/ Please refer to the licence to obtain terms for any further reuse or distribution of this work.
Collection
Abstract
Industrial application of life-cycle cost analysis (LCCA) is somewhat limited, with techniques deemed overly theoretical, resulting in a reluctance to realise (and pass onto the client) the advantages to be gained from objective LCCA comparison of (sub)component material specifications. To address the need for a user-friendly structured approach to facilitate complex processing, the work described here develops a new, accessible framework for LCCA of construction projects; it acknowledges Artificial Neural Networks (ANNs) to compute the whole-cost(s) of construction and uses the concept of cost significant items (CSI) to identify the main cost factors affecting the accuracy of estimation. ANN is a powerful means to handle non-linear problems and subsequently map relationships between complex input/output data and address uncertainties. A case study documenting 20 building projects was used to test the framework and estimate total running costs accurately. Two methods were used to develop a neural network model; firstly a back-propagation method using MATLAB SOFTWARE; and secondly, spread-sheet optimisation using Microsoft Excel Solver. The best network used 19 hidden nodes, with the tangent sigmoid used as a transfer function for both methods. The results is that in both models, the accuracy of the developed NN model is 1% (via Excel-solver) and 2% (via back-propagation) respectively.
Related items
Showing items related by title, author, creator and subject.
-
Hasan, Umair; Whyte, Andrew ; Al Jassmi, H. (2019)Life-cycle management of road network projects traditionally emphasise material production and construction stages, with less attention given to usage stage and functionality improvement. Increasingly there is a need to ...
-
Mostafa, Fahed. (2011)Market risk refers to the potential loss that can be incurred as a result of movements inmarket factors. Capturing and measuring these factors are crucial in understanding andevaluating the risk exposure associated with ...
-
Towner, Martin ; Cupak, Martin ; Deshayes, Jean; Howie, Robert ; Hartig, Ben; Paxman, Jonathan ; Sansom, Eleanor ; Devillepoix, Hadrien ; Jansen-Sturgeon, Trent; Bland, Philip (2020)The detection of fireballs streaks in astronomical imagery can be carried out by a variety of methods. The Desert Fireball Network uses a network of cameras to track and triangulate incoming fireballs to recover meteorites ...