Curtin University Homepage
  • Library
  • Help
    • Admin

    espace - Curtin’s institutional repository

    JavaScript is disabled for your browser. Some features of this site may not work without it.
    View Item 
    • espace Home
    • espace
    • Curtin Research Publications
    • View Item
    • espace Home
    • espace
    • Curtin Research Publications
    • View Item

    A new mathematical programming model for production schedule optimisation in underground mining operations

    Access Status
    Fulltext not available
    Authors
    Nehring, M.
    Topal, Erkan
    Little, J.
    Date
    2010
    Type
    Journal Article
    
    Metadata
    Show full item record
    Citation
    Nehring, M. and Topal, E. and Little, J. 2010. A new mathematical programming model for production schedule optimisation in underground mining operations. Journal of The South African Institute of Mining and Metallurgy. 110 (8): pp. 1-11.
    Source Title
    Journal of South African Institute of Mining and Metallurgy
    ISSN
    0038-223X
    School
    WASM Mining Engineering Teaching Area
    URI
    http://hdl.handle.net/20.500.11937/16748
    Collection
    • Curtin Research Publications
    Abstract

    Mixed integer programming (MIP) has been used for optimizing production schedules of mines since the 1960s and is recognized as having significant potential for optimizing production scheduling problems for both surface and underground mining. The major problem in long-term production scheduling for underground ore bodies generally relate to the large number of variables needed to formulate a MIP model, which makes it too complex to solve. As the number of variables in the model increase, solution times are known to increase at an exponential rate. In many instances the more extensive use of MIP models has been limited due to excessive solution times. This paper reviews production schedule optimization studies for underground mining operations. It also presents a classical MIP model for optimized production scheduling of a sublevel stoping operation and proposes a new model formulation to significantly reduce solution times without altering results while maintaining all constraints.A case study is summarized investigating solution times as five stopes are added incrementally to an initial ten stope operation, working up to a fifty stope operation. It shows substantial improvement in the solution time required when using the new formulation technique. This increased efficiency in the solution time of the MIP model allows it to solve much larger underground mine scheduling problems within a reasonable timeframe with the potential to substantially increase the net present value (NPV) of these projects. Finally, results from the two models are also compared to that of a manually generated schedule which show, the clear advantages of mathematical programming in obtaining optimal solutions.

    Related items

    Showing items related by title, author, creator and subject.

    • Simultaneous optimisation of stope boundaries and long term production scheduling for production shedules
      Little, J.; Topal, Erkan; Knights, P. (2011)
      Optimisation techniques for underground metalliferous mine design and planning are not commonplace like their open cut counterpart. Optimisation studies which have focused on underground design and planning are amenable ...
    • Evaluation of monorail haulage systems in metalliferous underground mining
      Besa, Bunda (2010)
      The decline is a major excavation in metalliferous mining since it provides the main means of access to the underground and serves as a haulage route for underground trucks. However, conventional mining of the decline to ...
    • The future of underground mine planning in the era of machine learning: Opportunities for engineering robustness and flexibility
      Chimunhu, Prosper; Topal, Erkan; Asad, Mohammad Waqar Ali; Shirani Faradonbeh, Roohollah ; Duany Ajak, Ajak (2024)
      Machine learning (ML) applications are increasing their footprint in underground mine planning, enabled by the gradual enrichment of research methods. Indeed, improvements in prediction results have been accelerated in ...
    Advanced search

    Browse

    Communities & CollectionsIssue DateAuthorTitleSubjectDocument TypeThis CollectionIssue DateAuthorTitleSubjectDocument Type

    My Account

    Admin

    Statistics

    Most Popular ItemsStatistics by CountryMost Popular Authors

    Follow Curtin

    • 
    • 
    • 
    • 
    • 

    CRICOS Provider Code: 00301JABN: 99 143 842 569TEQSA: PRV12158

    Copyright | Disclaimer | Privacy statement | Accessibility

    Curtin would like to pay respect to the Aboriginal and Torres Strait Islander members of our community by acknowledging the traditional owners of the land on which the Perth campus is located, the Whadjuk people of the Nyungar Nation; and on our Kalgoorlie campus, the Wongutha people of the North-Eastern Goldfields.