A new method for improving reliability and line loss in distribution networks
Access Status
Authors
Date
2010Type
Metadata
Show full item recordCitation
Source Title
Source Conference
ISBN
Collection
Abstract
PrintIn this paper, both Distributed Generators (DG) and capacitors are allocated and sized optimally for improving line loss and reliability. The objective function is composed of the investment cost of DGs and capacitors along with loss and reliability which are converted to the genuine dollar. The bus voltage and line current are considered as constraints which should be satisfied during the optimization procedure. Hybrid Particle Swarm Optimization as a heuristic based technique is used as the optimization method. The IEEE 69-bus test system is modified and employed to evaluate the proposed algorithm. The results illustrate that the lowest cost planning is found by optimizing both DGs and capacitors in distribution networks.
Related items
Showing items related by title, author, creator and subject.
-
Li, Bin (2011)In this thesis, we consider several types of optimal control problems with constraints on the state and control variables. These problems have many engineering applications. Our aim is to develop efficient numerical methods ...
-
Yu, Changjun (2012)In this thesis, We propose new computational algorithms and methods for solving four classes of constrained optimization and optimal control problems. In Chapter 1, we present a brief review on optimization and ...
-
Zhou, Jingyang (2011)In this thesis, we deal with several optimal guidance and control problems of the spacecrafts arising from the study of lunar exploration. The research is composed of three parts: 1. Optimal guidance for the lunar module ...