Curtin University Homepage
  • Library
  • Help
    • Admin

    espace - Curtin’s institutional repository

    JavaScript is disabled for your browser. Some features of this site may not work without it.
    View Item 
    • espace Home
    • espace
    • Curtin Research Publications
    • View Item
    • espace Home
    • espace
    • Curtin Research Publications
    • View Item

    Transmission line power transfer capability improvement: Case study

    Access Status
    Fulltext not available
    Authors
    Abu-Siada, Ahmed
    Karunar, C.
    Date
    2012
    Type
    Conference Paper
    
    Metadata
    Show full item record
    Citation
    Abu-Siada, A. and Karunar, Chatura. 2012. Transmission line power transfer capability improvement: Case study, in Proceedings of the 8th Power Plant and Power Systems Control Symposium, Sep 2-5 2012, pp. 495-499. Toulouse, France: International Federation of Automatic Control (IFAC).
    Source Title
    Procceedings of 8th IFAC Symposium on Power Plant & Power Systems Control
    Source Conference
    8th IFAC Symposium on Power Plant & Power Systems Control
    DOI
    10.3182/20120902-4-FR-2032.00087
    ISSN
    1474-6670
    URI
    http://hdl.handle.net/20.500.11937/20265
    Collection
    • Curtin Research Publications
    Abstract

    This paper investigates different approaches to improve the power transfer capability (PTC) of transmission lines. Study was performed on the Eastern Gold Fields (EGF) area of the Western Power network in Western Australia where power transfer to this area is currently enhanced using four saturable reactor types static var Compensators (SR SVCs) installed in this region. These SR SVCs have reached to the end of operational life and they are scheduled for replacement by different dynamic reactive power devices such as Static Synchronous Compensators (STATCOMs) or Thyristor Controlled SVCs (TSVCs). Another proposed option to enhance the PTC to this area is by upgrading the 220 kV transmission line to 275 kV transmission line and / or using series capacitor compensation. This paper introduces technical and economical study for the aforementioned options and suggests a reliable and cost effective approach to improve the PTC to EGF area.

    Related items

    Showing items related by title, author, creator and subject.

    • Improvement of Transmission Line Power Transfer Capability, Case Study
      Abu-Siada, Ahmed; Karunar, C. (2012)
      This paper investigates different approaches to improve the power transfer capability (PTC) of transmission lines. Study was performed on the Eastern Gold Fields (EGF) area of the Western Power network in Western Australia ...
    • Response of a transmission tower-line system at a canyon site to spatially varying ground motions
      Li, H.; Bai, F.; Tian, L.; Hao, Hong (2011)
      Collapses of transmission towers were often observed in previous large earthquakes such as the Chi-Chi earthquake in Taiwan and Wenchuan earthquake in Sichuan, China. These collapses were partially caused by the pulling ...
    • A Multi-Criteria Decision Framework for Optimal Augmentation of Transmission Grid - Addressing a Tool for Sensitive Zone Detection in Electricity Market
      Hesamzadeh, M.; Hosseinzadeh, N.; Wolfs, Peter (2008)
      Transmission system structure has an essential effect on the reliability of the power system and electricity market performance, especially when producers bid strategically. As part of on-going research on the design of ...
    Advanced search

    Browse

    Communities & CollectionsIssue DateAuthorTitleSubjectDocument TypeThis CollectionIssue DateAuthorTitleSubjectDocument Type

    My Account

    Admin

    Statistics

    Most Popular ItemsStatistics by CountryMost Popular Authors

    Follow Curtin

    • 
    • 
    • 
    • 
    • 

    CRICOS Provider Code: 00301JABN: 99 143 842 569TEQSA: PRV12158

    Copyright | Disclaimer | Privacy statement | Accessibility

    Curtin would like to pay respect to the Aboriginal and Torres Strait Islander members of our community by acknowledging the traditional owners of the land on which the Perth campus is located, the Whadjuk people of the Nyungar Nation; and on our Kalgoorlie campus, the Wongutha people of the North-Eastern Goldfields.