    Defects Prediction Towards Efficincy Gains in Construction Projects

    Access Status
    Fulltext not available
    Authors
    Almusharraf, Abdullah
    Whyte, Andrew
    Date
    2012
    Type
    Conference Paper
    
    Metadata
    Show full item record
    Citation
    Almusharraf, Abdullah and Whyte, Andrew. 2012. Defects Prediction Towards Efficincy Gains in Construction Projects, in Vimonsatit, V. and Singh, A. and Yazdani, S. (ed), Research, Development, and Practice in Structural Engineering and Construction, The 1st Australasia and South East Asia Conference in Structural Engineering and Construction (ASEA-SEC-1), Nov 28-Dec 2 2012, pp. 985-990. Perth, Western Australia: Research Publishing Services.
    Source Title
    Proceedings of the 1st Australasia and South East Asia Conference in Structural Engineering andConstruction (ASEA-SEC-1)
    Source Conference
    The 1st Australasia and South East Asia Conference in Structural Engineering andConstruction (ASEA-SEC-1)
    ISBN
    978-981-07-3678-1
    URI
    http://hdl.handle.net/20.500.11937/36320
    Collection
    • Curtin Research Publications
    Abstract

    One of the construction industry’s major problem areas is the potential negative impact of overlapping tasks within on-site work programmes as part of an integrated critical-path, work-breakdown-structured approach; this work seeks identification and mitigation of error and defect resulting from concurrent work-packages during the construction phase. A main challenge addressed is an accurate means and method to predict, at the early pre-construction planning stage, the cumulative defects that can result from overlapping tasks during construction, and subsequently seek to avoid, mitigate and better manage overlapping tasks that influence negatively project cost and duration. This paper presents work at the initial preparatory stages of a research project that seeks identification and understanding of the behaviour of overlapping task variables that result in error and/or rework; future work shall seek ultimately to go towards development of a predictive model to address cumulative defect. The research work being conducted is argued as significant in that it seeks an increase in the reliability of overlapping task completions during the construction phase. Objectives include: identification (and distribution) of defects during the construction phase, towards future; defect susceptibility for specific activities; identification of key overlapping task(s) variables; and, examination of the behaviour of each variable and its impact upon the overall project quality in general. Initial findings (where a percentage method determines rate of each factor for project phase and the source that caused the defects) indicate that the construction phase has the highest rate of defect appearance (67%) followed by the design phase (30%). Project process causes most defects (43%) followed by people causing 38% of defects.

    Related items

    Showing items related by title, author, creator and subject.

    • A framework for proactive construction defect management using BIM, augmented reality and ontology-based data collection template
      Park, Chan-Sik; Lee, Do-Yeop; Kwon, Oh-Seong; Wang, Xiangyu (2013)
      In construction process, defects occur inevitably and repeatedly. It is one of the primary causes of project schedule and cost overruns. Many studies on defect causation analysis and management system have been conducted ...
    • Task-based defect management: anatomical classification
      Almusharraf, Abdullah; Whyte, Andrew (2016)
      Purpose – Studies on the construction defects and quality deviations have been commissioned and published in many countries, showing the global status of the issues related with construction defects. Therefore, the quality ...
    • Accuracy in estimating project cost construction contingency - a statistical analysis
      Baccarini, David (2004)
      The cost performance of building construction projects is a key success criterion for project sponsors. Project cost performance is typically measured by comparing final cost against budget. A key component of the project ...
    Advanced search

    Browse

    Communities & CollectionsIssue DateAuthorTitleSubjectDocument TypeThis CollectionIssue DateAuthorTitleSubjectDocument Type

    My Account

    Admin

    Statistics

    Most Popular ItemsStatistics by CountryMost Popular Authors

    Follow Curtin

    • 
    • 
    • 
    • 
    • 

    CRICOS Provider Code: 00301JABN: 99 143 842 569TEQSA: PRV12158

    Copyright | Disclaimer | Privacy statement | Accessibility

    Curtin would like to pay respect to the Aboriginal and Torres Strait Islander members of our community by acknowledging the traditional owners of the land on which the Perth campus is located, the Whadjuk people of the Nyungar Nation; and on our Kalgoorlie campus, the Wongutha people of the North-Eastern Goldfields.