Show simple item record

dc.contributor.authorYunus, A m
dc.contributor.authorMasoum, Mohammad Sherkat
dc.contributor.authorAbu-Siada, Ahmed
dc.contributor.editorMochamad Ashari
dc.date.accessioned2017-01-30T14:09:44Z
dc.date.available2017-01-30T14:09:44Z
dc.date.created2015-03-03T20:17:24Z
dc.date.issued2012
dc.identifier.citationYunus, A m and Masoum, M.S. and Abu-Siada, A. 2012. Impact of intermittent misfire and fire-through on the performance of full converter based WECS, in 22nd Australasian Universities Power Engineering Conference 2012 (AUPEC), Sep 26-29 2012. Bali, Indonesia: IEEE.
dc.identifier.urihttp://hdl.handle.net/20.500.11937/37912
dc.description.abstract

The integration of wind turbines into modern power grids has significantly increased during the last decade. The wind turbine equipped with full converter based wind energy Conversion System (FCWECS) represented about 20.3% of the worldwide total wind capacity in 2003. Since FCWECS is equipped with a voltage source inverter (VSI), it is vulnerable that misfire and fire-through may occur within the VSI switches. In this paper, impact of these switching malfunctions on FCWECS performance is investigated and discussed. Detailed simulations of the system under study are carried out using Matlab/Simulink to highlight the influence of these converter internal faults on PCC voltage, DC link voltage and shaft speed, as well as generator active and reactive power. Furthermore, compliance of the FCWECS with Spain fault ride through (FRT) grid codes is also investigated.

dc.publisherInstitut Teknologi Sepuluh Nopember (ITS)
dc.relation.urihttp://ieeexplore.ieee.org/xpl/articleDetails.jsp?arnumber=6360194
dc.titleImpact of intermittent misfire and fire-through on the performance of full converter based WECS
dc.typeConference Paper
dcterms.source.titleProceedings of the 22nd Australasian Universities Power Engineering Conference
dcterms.source.seriesProceedings of the 22nd Australasian Universities Power Engineering Conference
dcterms.source.isbn9781921897078
dcterms.source.conference22nd Australasian Universities Power Engineering Conference
dcterms.source.conference-start-dateSep 26 2012
dcterms.source.conferencelocationBali, Indonesia
dcterms.source.placeBali, Indonesia
curtin.note

Copyright © 2012 IEEE. Personal use of this material is permitted. Permission from IEEEmust be obtained for all other uses, in any current or future media, including reprinting/republishing this material for advertising or promotional purposes, creating new collective works, for resale or redistribution to servers or lists, or reuse of any copyrighted component of this work in other works.

curtin.departmentDepartment of Electrical and Computer Engineering
curtin.accessStatusOpen access


Files in this item

Thumbnail

This item appears in the following Collection(s)

Show simple item record