dc.identifier.citationPerera, N. and Sutrisna, M. and Yiu, T. 2016. Decision-making model for selecting the optimum method of delay analysis in construction projects. Journal of Management in Engineering. 32 (5): pp. 04016009-1-04016009-14.
dc.identifier.urihttp://hdl.handle.net/20.500.11937/51853
dc.identifier.doi10.1061/(ASCE)ME.1943-5479.0000441
dc.description.abstract

In construction, delay claims resolution is at the center of apportioning liabilities between the claiming party and the defending party. This process generally consists of two phases of causation: (1) establishing each party's potential liability for the claimed occurrence; and (2) determining the quantum of the effect flowing from that liability. However, a lack of consensus among the practitioners of disputing parties as a result of the existence of various theories, concepts, and methodologies for apportioning liabilities has been acknowledged as an obstructing factor in delay claims resolution. When determining the quantum of the effects flowing from a liability, one potential main obstacle in apportioning liabilities is the existing dichotomous use of method of delay analysis (MDA), which can be responsible for the inconsistent outcomes of delay analyses and result in distrust among the disputing parties. Aiming to address this problem, the research project was set to develop a decision making model (DMM) to support practitioners in this matter. Following its validation, the developed DMM enhances fairness and transparency in apportioning liabilities, hence overcoming possible skepticism about the impartiality of the chosen MDA. Addressing the current need for an objective way to select the MDA, this DMM has made a contribution to the body of knowledge of construction engineering, particularly in the claims management aspects, by providing a novel tool that can be considered objective, reliable, and defendable for selecting the optimum MDA under the given circumstances of a construction project, and therefore minimizing the potential of conflict and disputes in apportioning delays' liabilities.

dc.publisherASCE
dc.titleDecision-making model for selecting the optimum method of delay analysis in construction projects
dc.typeJournal Article
dcterms.source.volume32
dcterms.source.number5
dcterms.source.startPage04016009
dcterms.source.endPage1
dcterms.source.issn0742-597X
dcterms.source.titleJournal of Management in Engineering
curtin.departmentDepartment of Construction Management
curtin.accessStatusFulltext not available


Files in this item

FilesSizeFormatView

There are no files associated with this item.

This item appears in the following Collection(s)

Show simple item record