A study of the factors affecting construction time in Western Australia
Access Status
Authors
Date
2012Type
Metadata
Show full item recordCitation
Source Title
ISSN
Collection
Abstract
Delays are major problems that face the Western Australia’s construction industry. Delays can lead to many negative effects such as cost overruns, and is of high concern to those who are involved in the construction industry. This study was set to identify the major causes of delays in the Western Australian construction industry, by means of a literature review and a questionnaire survey. A total of 48 delay factors were obtained from literature review and were further categorised into eight major groups that contributed to the causes of delay. The questionnaire survey was distributed to the targeted respondents from a combination of clients, contractors, and consultants in Perth, Western Australia. About 32 respondents participated in the survey. Based on the data received, albeit limited, the top ten most important causes identified were: (1) Shortage of skills; (2) Financial difficulties; (3) Shortage of labour; (4) Unrealistic deadlines for project completion; (5) Unforeseen ground conditions; (6) Poor organization of the contractor or consultant; (7) Poor communication; (8) Underestimation of time of completion; (9) low speed of decision; and (10) Design errors made by designers.
Related items
Showing items related by title, author, creator and subject.
-
Spanoghe, Patrick T. (1996)The western rock lobster (WRL), Panulirus cygnus is a decapod crustacean which is found in abundance in the coastal waters of Western Australia and which supports a major fishery of economic importance for the State, with ...
-
Chai, Qinqin (2013)In this thesis, we develop new computational methods for three classes of dynamic optimization problems: (i) A parameter identification problem for a general nonlinear time-delay system; (ii) an optimal control problem ...
-
Tan, A.; Zaman, Atiq; Sutrisna, Monty (2018)Purpose The purpose of this study is to investigate ways of transferring knowledge and information during the life-cycle phases of construction projects, particularly between the construction and occupancy phases, and to ...