Show simple item record

dc.contributor.authorFilippini, M.
dc.contributor.authorGreene, William
dc.date.accessioned2017-06-23T03:01:07Z
dc.date.available2017-06-23T03:01:07Z
dc.date.created2017-06-19T03:39:38Z
dc.date.issued2016
dc.identifier.citationFilippini, M. and Greene, W. 2016. Persistent and transient productive inefficiency: a maximum simulated likelihood approach. Journal of Productivity Analysis. 45 (2): pp. 187-196.
dc.identifier.urihttp://hdl.handle.net/20.500.11937/53758
dc.identifier.doi10.1007/s11123-015-0446-y
dc.description.abstract

The productive efficiency of a firm can be seen as composed of two parts, one persistent and one transient. The received empirical literature on the measurement of productive efficiency has paid relatively little attention to the difference between these two components. Ahn and Sickles (Econ Rev 19(4):461–492, 2000) suggested some approaches that pointed in this direction. The possibility was also raised in Greene (Health Econ 13(10):959–980, 2004. doi:10.1002/hec.938), who expressed some pessimism over the possibility of distinguishing the two empirically. Recently, Colombi (A skew normal stochastic frontier model for panel data, 2010) and Kumbhakar and Tsionas (J Appl Econ 29(1):110–132, 2012), in a milestone extension of the stochastic frontier methodology have proposed a tractable model based on panel data that promises to provide separate estimates of the two components of efficiency. The approach developed in the original presentation proved very cumbersome actually to implement in practice. Colombi (2010) notes that FIML estimation of the model is ‘complex and time consuming.’ In the sequence of papers, Colombi (2010), Colombi et al. (A stochastic frontier model with short-run and long-run inefficiency random effects, 2011, J Prod Anal, 2014), Kumbhakar et al. (J Prod Anal 41(2):321–337, 2012) and Kumbhakar and Tsionas (2012) have suggested other strategies, including a four step least squares method. The main point of this paper is that full maximum likelihood estimation of the model is neither complex nor time consuming. The extreme complexity of the log likelihood noted in Colombi (2010), Colombi et al. (2011, 2014) is reduced by using simulation and exploiting the Butler and Moffitt (Econometrica 50:761–764, 1982) formulation. In this paper, we develop a practical full information maximum simulated likelihood estimator for the model. The approach is very effective and strikingly simple to apply, and uses all of the sample distributional information to obtain the estimates. We also implement the panel data counterpart of the Jondrow et al. (J Econ 19(2–3):233–238, 1982) estimator for technical or cost inefficiency. The technique is applied in a study of the cost efficiency of Swiss railways.

dc.publisherSpringer
dc.titlePersistent and transient productive inefficiency: a maximum simulated likelihood approach
dc.typeJournal Article
dcterms.source.volume45
dcterms.source.number2
dcterms.source.startPage187
dcterms.source.endPage196
dcterms.source.issn0895-562X
dcterms.source.titleJournal of Productivity Analysis
curtin.departmentSchool of Economics and Finance
curtin.accessStatusFulltext not available


Files in this item

FilesSizeFormatView

There are no files associated with this item.

This item appears in the following Collection(s)

Show simple item record