Integrated Design and Cost Management for Civil Engineers
Access Status
Authors
Date
2014Type
Metadata
Show full item recordCitation
ISBN
School
Collection
Abstract
A guide to successfully designing, estimating, and scheduling a civil engineering project, Integrated Design and Cost Management for Civil Engineers shows how practicing professionals can design fit-for-use solutions within established time frames and reliable budgets. This text combines technical compliance with practical solutions in relation to cost planning, estimating, time, and cost control. It incorporates solutions that are technically sound as well as cost effective and time efficient. It focuses on the integration of design and construction based on solid engineering foundations contained within a code of ethics, and navigates engineers through the complete process of project design, pricing, and tendering.
Related items
Showing items related by title, author, creator and subject.
-
Cepuritis, Peter M. (2010)In order to develop an appropriate mine design, a thorough understanding of the rock mass conditions and its potential response to mining is required. Rock mass characterisation is a key component in developing models of ...
-
Love, Peter; Lopez, R.; Kim, J.; Kim, M. (2014)The statistical characteristics of design error rectification costs experienced in 139 Australian construction projects are analyzed. Theoretical probability distributions are fitted to the design error cost data. A ...
-
Jaggar, D.; Love, Peter; Smith, J.; Olatunji, O. (2016)Cost management of all building projects has become increasingly important as clients in the public and private sector demand the highest quality cost planning services with accurate budgeting and cost control. All members ...