Object oriented modeling: Retrospective systems information model for constructability assessment
Access Status
Authors
Date
2016Type
Metadata
Show full item recordCitation
Source Title
ISSN
School
Funding and Sponsorship
Collection
Abstract
© 2016 Elsevier B.V.Object oriented modeling (OOM) has become an integral part of the design process in construction due to advances in computer software. Despite these advances there remains a tendency for Computer-Aided-Design (CAD) to be used as the medium to assist in the creation, modification, analysis and optimization of Electrical and Instrumentation (E&I) systems within heavy industrial engineering projects. In this paper, a retrospective OOM (i.e., Systems Information Model (SIM)), for the E&I systems of a utility facility, which was constructed for an Engineering Procurement and Construction (EPC) contractor for the purpose of undertaking a constructability assessment prior to the commencement of construction is presented and discussed. The CAD drawings and cable schedule produced by the EPC were provided to an E&I organization to undertake a constructability assessment; errors, omissions and information redundancy were identified and quantified. The SIM model was then used to examine a tender proposal from a construction subcontractor (CS) of the EPC; discrepancies were identified and it is suggested that differences arose due to the prevailing errors and omissions. The potential use of a SIM during construction as a quality assurance/control (QA/QC) is then examined, as it is suggested that it can be used to ensure the development of an ‘As-built’ model and provide a realistic representation of the constructed asset, which safeguards its integrity for operations and maintenance.
Related items
Showing items related by title, author, creator and subject.
-
Nie, Katherine Su (2007)Numerous popular business publications and academic literature have highlighted that the Chinese cultural phenomenon of guanxi has made noticeable impacts on the economic efficiency in China’s economic transition. Despite ...
-
Wang, Jun; Sun, W.; Shou, W.; Wang, Xiangyu; Wu, Changzhi; Chong, Heap Yih; Liu, Y.; Sun, C. (2014)In the construction process, real-time quality control and early defects detection are still the most significant approach to reducing project schedule and cost overrun. Current approaches for quality control on construction ...
-
Wang, J.; Sun, W.; Shou, W.; Wang, X.; Wu, Changzhi; Chong, Heap Yih; Liu, Yang; Sun, C. (2014)© 2014, Springer Science+Business Media Dordrecht. In the construction process, real-time quality control and early defects detection are still the most significant approach to reducing project schedule and cost overrun. ...