    Building information modeling in construction conflict management

    Access Status
    Open access via publisher
    Authors
    Charehzehi, A.
    Chai, C.
    Md Yusof, A.
    Chong, Heap Yih
    Loo, S.
    Date
    2017
    Collection
    • Curtin Research Publications
    Type
    Journal Article
    Metadata
    Show full item record
    Abstract

    © 2017, © The Author(s) 2017. Dispute is recognized as critical cause of deficiency and low performance in construction projects. Plenty of studies have been done in construction dispute management recently; however, there are no studies on construction dispute elimination. This study aims to propose a building information modeling (BIM) approach to control conflict causes before the occurrenc e of dispute. BIM is one of the latest platforms that promote a high level of collaboration, information sharing, and coordination where its implementation ranges from project initialization to completion stage. The circumstances associating with BIM technology can be utilized to explore the possibilities in conflict and dispute resolution system. Questionnaire surveys are used to collect the primary data. Analytical hierarchy process (AHP) and multi attribute utility technique (MAUT) are adopted to develop an algorithm and a decision-making framework to manage and resolve the potential conflict causes, particularly for the Malaysian construction industry. Data analysis emerged that five critical conflict factors in Malaysian construction industry are insufficient monitoring of CPM scheduling and updates requirements; failures to understand and correctly bid or price the works; delay in running bill payment; inadequate contractors’ management, supervision, and coordination; and error and omission in design that are originated from time, cost, quality, and documentation. Further analysis to prioritize BIM functions in construction conflict management has been done by the combination of AHP and MAUT results. Consequently, it is affirmed that clash detection and cost estimating, 4D scheduling, 3D visualization and structure analysis as BIM functions obtained the highest score to control conflicting factors.

    Citation
    Charehzehi, A. and Chai, C. and Md Yusof, A. and Chong, H.Y. and Loo, S. 2017. Building information modeling in construction conflict management. International Journal of Engineering Business Management. 9.
    Source Title
    International Journal of Engineering Business Management
    URI
    http://hdl.handle.net/20.500.11937/62115
    DOI
    10.1177/1847979017746257
    Department
    School of Design and the Built Environment

    Related items

    Showing items related by title, author, creator and subject.

    • Building information modeling in construction conflict management
      Charehzehi, A.; Chai, C.; Md Yusof, A.; Chong, Heap Yih; Loo, S. (2017)
      © 2017, © The Author(s) 2017. Dispute is recognized as critical cause of deficiency and low performance in construction projects. Plenty of studies have been done in construction dispute management recently; however, there ...
    • Conceptualizing building information modeling: In construction conflict management
      Charehzehi, A.; Yusof, A.; Chai, C.; Chong, Heap Yih (2015)
      Conflicts and claims are prevalent features in construction projects and are getting more serious due to the increased size and complexity of the projects nowadays. Innovative, effective and strategic dispute resolution ...
    • Decision-making model for selecting the optimum method of delay analysis in construction projects
      Perera, N.; Sutrisna, Monty; Yiu, T. (2016)
      In construction, delay claims resolution is at the center of apportioning liabilities between the claiming party and the defending party. This process generally consists of two phases of causation: (1) establishing each ...
    Advanced search

    Browse

    Communities & CollectionsIssue DateAuthorsTitlesSubjectsDocument TypesThis CollectionIssue DateAuthorsTitlesSubjectsDocument Types

    My Account

    Log in

    Statistics

    Most Popular ItemsStatistics by CountryMost Popular Authors

    Connect with Curtin

    • 
    • 
    • 
    • 
    • 
    • 
    • 

    CRICOS Provider Code: 00301JABN: 99 143 842 569TEQSA: PRV12158

    Send FeedbackContact Us
    DSpace software copyright © 2002-2015  DuraSpace