Abstract
The AU$8.3 billion Sydney Metro Northwest Rail Link is Australia’s largest public transport project and includes the construction of twin 15-km tunnels. A temporary precast facility was constructed to produce the wall-linings for the tunnels. The facility is operated 24 h a day from Monday to Friday and 12 h on Saturday with 100 workers. To enhance the safety performance within the facility, an experiential learning safety program referred to as See the Difference was implemented in conjunction with other safety interventions, although the program was the glue that held all initiatives together. This paper describes the safety program and examines its effectiveness and contribution it made toward reducing incidents and engendering teamwork within the temporary precast facility. It was observed that the See the Difference program had a positive influence on changing the mindset of the workforce from a fixed one to one of growth, which was developed through a process of coaching. The paper draws on actual practice and presents a novel approach to improving safety through the introduction of an experiential safety program. The case study offers a learning opportunity for other organizations that are confronted with implementing safety awareness programs, particularly for infrastructure transportation megaprojects.
Related items
Showing items related by title, author, creator and subject.
-
Kusumah, Yaya S, (2001)The facility layout design problem is concerned with determining the arrangement and configuration of facilities, which optimizes a prescribed objective such as profit, cost, or distance, and which satisfies various ...
-
Condition Based Maintenance (CBM) in the Oil and Gas Industry: An Overview of Methods and TechniquesTelford, S.; Mazhar, Muhammad Ilyas; Howard, Ian (2011)On and offshore development projects in the oil and gas industry are predominantly capital-intensive investments, with the potential for serious financial and environmental consequences should a catastrophic failure occur. ...
-
Schaper, Louise; Lapins, M. (2007)This paper comprises a case study report on the implementation of an intelligent building solution at SwanCare Group. The paper discusses the technology and development process involved in transforming SwanCare into one ...