Curtin University Homepage
  • Library
  • Help
    • Admin

    espace - Curtin’s institutional repository

    JavaScript is disabled for your browser. Some features of this site may not work without it.
    View Item 
    • espace Home
    • espace
    • Curtin Research Publications
    • View Item
    • espace Home
    • espace
    • Curtin Research Publications
    • View Item

    Determination of short-term power dispatch schedule for a wind farm incorporated with dual-battery energy storage scheme

    Access Status
    Fulltext not available
    Authors
    Yao, D.
    Choi, San Shing
    Tseng, K.
    Lie, T.
    Date
    2012
    Type
    Journal Article
    
    Metadata
    Show full item record
    Citation
    Yao, D. and Choi, S.S. and Tseng, K. and Lie, T. 2012. Determination of short-term power dispatch schedule for a wind farm incorporated with dual-battery energy storage scheme. IEEE Transactions on Sustainable Energy. 3 (1): pp. 74-84.
    Source Title
    IEEE Transactions on Sustainable Energy
    DOI
    10.1109/TSTE.2011.2163092
    ISSN
    1949-3029
    School
    School of Electrical Engineering, Computing and Mathematical Science (EECMS)
    URI
    http://hdl.handle.net/20.500.11937/65803
    Collection
    • Curtin Research Publications
    Abstract

    A battery energy storage scheme to enable short-term dispatch commitment from a grid-connected wind-turbine generating power station is considered. Among the various types of energy storage medium, technical factors leading to the selection of battery are explained. The scheme utilizes two battery energy storage systems (BESS) in which the generated wind power charges one BESS while concurrently, the second BESS is to discharge power into the grid. The role of the two BESS interchanges when the BESS reaches specified state of charge/discharge. Furthermore, based on forecasted charging wind power and the monitored states of charge of the two BESS, the discharge power level from the generating station is determined and scheduled a few hours ahead. The dispatch scheme maximizes wind energy harnessed, achieved with the minimum number of the BESS switch-overs. The design thus prolongs the service life of the BESS. Numerical examples to demonstrate the performance of the scheme are also included. © 2010 IEEE.

    Related items

    Showing items related by title, author, creator and subject.

    • Dynamic study of a battery change-over scheme of a windfarm containing dual BESS
      Yao, D.; Choi, San Shing; Tseng, K.; Lie, T. (2012)
      The wind farm-dual-battery energy storage systems (BESS) described in [1] is studied in greater detail for those instances when the battery banks change-over. The primary design objective of the wind farm-BESS scheme is ...
    • Grid-Connected Lithium-Ion Battery Energy Storage System for Load Leveling and Peak Shaving
      Hosseini Mehr, Tahoura; Masoum, Mohammad Sherkat; Jabalameli, Nasim (2013)
      Load leveling, peak shaving and power demand management are major applications of a grid-connected battery energy storage system (BESS), especially in an autonomous power network. Lithium-ion BESS has started to become ...
    • Frequency control ancillary service provided by a wind farm: dual-BESS scheme
      YAO, D.; Choi, San Shing; TSENG, K.; LIE, T. (2014)
      © 2014, The Author(s). Network frequency control function is incorporated into a grid-connected wind farm-dual battery energy storage system (BESS) scheme. The design of the scheme takes advantage of the rapid response ...
    Advanced search

    Browse

    Communities & CollectionsIssue DateAuthorTitleSubjectDocument TypeThis CollectionIssue DateAuthorTitleSubjectDocument Type

    My Account

    Admin

    Statistics

    Most Popular ItemsStatistics by CountryMost Popular Authors

    Follow Curtin

    • 
    • 
    • 
    • 
    • 

    CRICOS Provider Code: 00301JABN: 99 143 842 569TEQSA: PRV12158

    Copyright | Disclaimer | Privacy statement | Accessibility

    Curtin would like to pay respect to the Aboriginal and Torres Strait Islander members of our community by acknowledging the traditional owners of the land on which the Perth campus is located, the Whadjuk people of the Nyungar Nation; and on our Kalgoorlie campus, the Wongutha people of the North-Eastern Goldfields.