Pilot Point Optimization of Mining Boundaries for Lateritic Metal Deposits: Finding the Trade-off Between Dilution and Ore Loss
Access Status
Authors
Date
2019Type
Metadata
Show full item recordCitation
Source Title
ISSN
School
Remarks
The final publication is available at Springer via 10.1007/s11053-018-9380-9
Collection
Abstract
Geological contacts in lateritic metal deposits (footwall topographies) often delineate the orebody boundaries. Spatial variations seen in such contacts are frequently higher than those for the metal grades of the deposit. Therefore, borehole spacing chosen based on the grade variations cannot adequately capture the geological contact variability. Consequently, models created using such boreholes cause high volumetric uncertainties in the actual and targeted ore extraction volumes, which, in turn, lead to high unplanned dilution and ore losses. In this paper, a method to design optimum ore/mining boundaries for lateritic metal deposits is presented. The proposed approach minimizes the dilution/ore losses and comprises two main steps. First, the uncertainty on the orebody boundary is represented using a set of stochastic realizations generated with a multiple-point statistics algorithm. Then, the optimal orebody boundary is determined using an optimization technique inspired by a model calibration method called Pilot Points. The pilot points represent synthetic elevation values, and they are used to construct smooth mining boundaries using the multilevel B-spline technique. The performance of a generated surface is evaluated using the expected sum of losses in each of the stochastic realizations. The simulated annealing algorithm is used to iteratively determine the pilot point values which minimize the expected losses. The results show a significant reduction in the dilution volume as compared to those obtained from the actual mining operation.
Related items
Showing items related by title, author, creator and subject.
-
Dagasan, Yasin (2018)This thesis focusses on the development of new techniques to improve the resource estimation of laterite-type bauxite deposits. Contributions of the thesis include (1) a methodology to variogram-free modelling of the ore ...
-
Jang, Hyong Doo; Topal, Erkan; Kawamura, Y. (2015)Unplanned dilution and ore loss directly influence not only the productivity of underground stopes, but also the profitability of the entire mining process. Stope dilution is a result of complex interactions between a ...
-
Jang, Hyong Doo ; Topal, Erkan; Kawamura, Y. (2015)Unplanned dilution and ore-loss are the most critical challenges in underground stoping operations. These problems are the main cause behind a mine closure and directly influencing the productivity of the underground stope ...