Space-Time Repetitive Project Scheduling Considering Location and Congestion
Access Status
Authors
Date
2018Type
Metadata
Show full item recordCitation
Source Title
ISSN
School
Funding and Sponsorship
Collection
Abstract
© 2018 American Society of Civil Engineers. Repetitive projects account for a large proportion of construction projects. Different from standard project scheduling problems, scheduling such projects requires considering both location and congestion, which is referred to as a space-time project scheduling problem. The literature on this kind of project scheduling is rather limited. In this paper, the authors study this problem and formulate it as a multiobjective mixed-integer programming problem which minimizes resource reallocation and congestion. A nondominated sorting genetic algorithm II (NSGAII) modified by integrating an electromagnetism-like mechanism, NSGAII-EM, is developed to solve this problem. Refurbishing a multistory hotel is used as an example to illustrate and validate the proposed method. Compared with the problem not considering location or congestion, the proposed model can offer better use of resources and can improve productivity through a better and safer working environment on the construction site. Furthermore, NSGAII-EM is validated by comparing it with NSGAII, strength Pareto evolutionary algorithm II (SPEAII), Pareto envelope-based selection algorithm II (PESAII), multiobjective evolutionary algorithm based on decomposition (MOEA/D), multiobjective particle swarm optimization (MOPSO), SPEAII-electromagnetism-like mechanism (SPEAII-EM), PESAII-electromagnetism-like mechanism (PESAII-EM), and MOEA/D-electromagnetism-like mechanism (MOEA/D-EM).
Related items
Showing items related by title, author, creator and subject.
-
Wang, L.; Chin, K.; Soh, Sie Teng (2016)Multiple transmit or receive (MTR) capability is a promising approach that significantly improves the capacity of Wireless Mesh Networks (WMNs). A fundamental problem is deriving a minimal link schedule or superframe that ...
-
Liu, J.; Hou, L.; Wang, Xiangyu (2014)Productivity is critical to large and complex capital projects in sectors like infrastructure and resources. It normally relates to a significant scheduling issue when pursuing both time and cost objectives. A poor planning ...
-
Nabavi, S.; Masoum, Mohammad Sherkat; Kazemi, A. (2011)This article presents a fuzzy-based genetic algorithm to maximize total social welfare and alleviate congestion by placement and sizing of one static synchronous series compensator device, considering its investment cost ...