Utilisation-based equipment selection
Access Status
Authors
Date
2018Type
Metadata
Show full item recordCitation
Source Title
School
Collection
Abstract
© 2018, Springer International Publishing AG. When performing equipment selection, we can best account for the operating cost by considering the utilised hours of the equipment. In a surface mine, equipment is often not utilised to full capacity and not accounting for this difference may lead to inferior solutions. In operations such as this, the cost of operating equipment depends on the age of the equipment while the utilisation of equipment is usually based on the equipment cost. The co-dependency of the age of the equipment and the utilisation has provided a barrier to tractable equipment selection models. That is, equipment is rarely utilised in a uniform way, causing the ageing of the equipment (when considering the total hours utilised) to be non-uniform. In our bid to address this issue, we consider a single-location multiple-period mine. We present a mixed-integer linear program that achieves optimal equipment selection and accounts for the equipment utilisation. This model considers pre-existing equipment and allows for heterogeneous fleets. We illustrate our approach on a case study.
Related items
Showing items related by title, author, creator and subject.
-
Burt, Christina Naomi (2008)In the surface mining industry the equipment selection problem involves choosing a fleet of trucks and loaders that have the capacity to move the materials specified in the mine plan. The optimisation problem is to select ...
-
Burt, C.; Caccetta, Louis (2018)© 2018, Springer International Publishing AG. When performing equipment selection, we can best account for the operating cost by considering the number of hours that the equipment has been utilised. In a surface mine, ...
-
Burt, C.; Caccetta, Louis (2018)© 2018, Springer International Publishing AG. In a simple surface mining scenario we can consider the mine to have one mining location and one dump-site connected by a single truck route. Our objective is to determine a ...