Curtin University Homepage
  • Library
  • Help
    • Admin

    espace - Curtin’s institutional repository

    JavaScript is disabled for your browser. Some features of this site may not work without it.
    View Item 
    • espace Home
    • espace
    • Curtin Research Publications
    • View Item
    • espace Home
    • espace
    • Curtin Research Publications
    • View Item

    Determination of the transition Point from Open Pit to Underground Mining

    75951.pdf (3.629Mb)
    Access Status
    Open access
    Authors
    Chung, J.
    Asad, Mohammad
    Topal, Erkan
    Ghosh, Apurna
    Date
    2016
    Type
    Conference Paper
    
    Metadata
    Show full item record
    Citation
    Chung, J. and Asad, M. and Topal, E. and Ghosh, A. and. 2016. Determination of the transition Point from Open Pit to Underground Mining, in Ninth AusIMM Open Pit Operators’ Conference, Nov 15-16 2016, pp. 96-103. Kalgoorlie, WA: AusIMM.
    Source Conference
    Ninth AusIMM Open Pit Operators' Conference 2016
    Faculty
    Faculty of Science and Engineering
    School
    WASM: Minerals, Energy and Chemical Engineering
    URI
    http://hdl.handle.net/20.500.11937/75747
    Collection
    • Curtin Research Publications
    Abstract

    Many open pit (OP) mines with considerable vertical extent are approaching towards the end of their life-of-mine (LOM), and some of them are seeking the opportunity to make the transition from OP to underground (UG) mining. While conventionally, the transition to UG mining is considered near or after the exhaustion of reserves within the ultimate pit, the decision on the best location for transition from OP to UG mining should be addressed at the strategic mine planning stage. However, defining the best location for the transition through conventional approach may not be an optimal option to explore, if UG is evident and exclusively viable from the inception. This clearly establishes the need for a mathematical model that aims to maximise the project value and considers OP and UG mining with crown pillar (CP) requirement simultaneously. Also, underground mine layout varies from one UG mining method to the other, and consequently the variation in the location of transition is eminent. Thus, focus on the selection of UG mining method must be a part of this analysis This paper presents an implementation of an integer programming (IP) based mathematical model that evaluates the changes in mining layout and the project value under possible variations in the transition point from OP to UG mining for sublevel stoping and block caving methods. The outcomes of the implementation reflect that mining strategies with OP transition to sublevel stoping and block caving methods generate higher value than OP only mining strategy. The case study not only demonstrates the difference in mining layout for both sublevel stoping method and block caving method, but also reflects that a joint consideration of OP mining, UG mining and CP placement helps to achieve maximum project value and resource utilisation.

    Related items

    Showing items related by title, author, creator and subject.

    • A numerical study for a mining project using real options valuation under commodity price uncertainty
      Haque, M; Topal, Erkan; Lilford, Eric (2014)
      Commodity price is an important factor for mining companies, as price volatility is a key parameter for mining project evaluation and investment decision making. The conventional discounted cash flow (DCF) methods are ...
    • Exploring digital twin systems in mining operations: A review. Green and Smart Mining Engineering
      Nobahar, Pouya; Xu, Chaoshui; Dowd, Peter; Shirani Faradonbeh, Roohollah (2024)
      Constant attempts have been made throughout human history to find solutions to complex issues. These attempts resulted in industrial revolutions and the transition from manual labor to machines and new technologies. The ...
    • Development of a mine closure and sustainable transitions micro-credential - challenges and perspectives
      Barakos, George ; Tapia Rivera, R.; Wightman, E. (2024)
      The continuously growing demand for critical minerals translates to finding and exploiting new mineral resources, meaning numerous new mining projects are expected to initiate operations. Accordingly, these operations ...
    Advanced search

    Browse

    Communities & CollectionsIssue DateAuthorTitleSubjectDocument TypeThis CollectionIssue DateAuthorTitleSubjectDocument Type

    My Account

    Admin

    Statistics

    Most Popular ItemsStatistics by CountryMost Popular Authors

    Follow Curtin

    • 
    • 
    • 
    • 
    • 

    CRICOS Provider Code: 00301JABN: 99 143 842 569TEQSA: PRV12158

    Copyright | Disclaimer | Privacy statement | Accessibility

    Curtin would like to pay respect to the Aboriginal and Torres Strait Islander members of our community by acknowledging the traditional owners of the land on which the Perth campus is located, the Whadjuk people of the Nyungar Nation; and on our Kalgoorlie campus, the Wongutha people of the North-Eastern Goldfields.