Curtin University Homepage
  • Library
  • Help
    • Admin

    espace - Curtin’s institutional repository

    JavaScript is disabled for your browser. Some features of this site may not work without it.
    View Item 
    • espace Home
    • espace
    • Curtin Research Publications
    • View Item
    • espace Home
    • espace
    • Curtin Research Publications
    • View Item

    Optimization of blending operation for Aswan phosphate mines using linear programming

    75966.pdf (1.504Mb)
    Access Status
    Open access
    Authors
    Ali, Mahrous
    Wasly, H.
    Abdellah, W.
    Jang, Hyong Doo
    Date
    2018
    Type
    Journal Article
    
    Metadata
    Show full item record
    Citation
    Ali, M. and Wasly, H.S. and Abdellah, W.R. Jang, H.D. 2018. Optimization of blending operation for Aswan phosphate mines using linear programming. Mining of Mineral Deposits. 12: pp. 1-8.
    Source Title
    Mining of Mineral Deposits
    DOI
    10.15407/mining12.04.001
    ISSN
    2415-3435
    Faculty
    Faculty of Science and Engineering
    School
    WASM: Minerals, Energy and Chemical Engineering
    URI
    http://hdl.handle.net/20.500.11937/75762
    Collection
    • Curtin Research Publications
    Abstract

    Purpose. The economic value of phosphate is reduced when randomly blending raw phosphate produced from different mines. Therefore, the blending process of different raw phosphate ores to produce economic percentage of P2O5 is essential to maximize the profit of a mine. Methods. This paper presents an application of Linear programming (LP) method to determine the optimum quantities of phosphate ore needed per each mine for blending process. Three phosphate operations, located in Aswan pro-vince south of Egypt, have been chosen for this study namely B1, B2 and C. Findings. The results of LP methods reveal that the phosphate ore of 24% of P2O5 will be produced by blending 16.8% of phosphate ore from operation B1, 9.42% of phosphate ore from operation B2 and 73.78% of phosphate ore from operation C. Whilst the phosphate ore of 22% P2O5 will only be obtained by blending 66.43% of phosphate ore from operation B1 and 33.57% from mine B2. Originality. Using the linear programming by applying solver function in mine operations. Practical implications. Applied linear programming in mining as regard mining operations to obtain the optimum solution in mining sites.

    Related items

    Showing items related by title, author, creator and subject.

    • A heuristic approach to long-range production planning of cement quarry operations
      Asad, Mohammad Waqar (2011)
      Cement manufacturing requires sustained supply of raw materials from limestone quarry. Raw materials inventory in limestone quarry is identified as a block model, usually, consisting of thousands of blocks. Each block ...
    • An optimisation approach to materials handling in surface mines
      Burt, Christina Naomi (2008)
      In the surface mining industry the equipment selection problem involves choosing a fleet of trucks and loaders that have the capacity to move the materials specified in the mine plan. The optimisation problem is to select ...
    • Mining truck scheduling with stochastic maintenance cost
      Topal, Erkan; Ramazan, S. (2012)
      Open pit mining operations utilize large scale and expensive equipment. For the mines implementing shovel and truck operation system, trucks constitute a large portion of these equipment and are used for hauling the mined ...
    Advanced search
    Browse
    Communities & CollectionsIssue DateAuthorTitleSubjectDocument TypeThis CollectionIssue DateAuthorTitleSubjectDocument Type

    My Account

    Admin
    Statistics
    Most Popular ItemsStatistics by CountryMost Popular Authors

    Follow Curtin

    • 
    • 
    • 
    • 
    • 

    CRICOS Provider Code: 00301JABN: 99 143 842 569TEQSA: PRV12158

    Copyright | Disclaimer | Privacy statement | Accessibility

    Curtin would like to pay respect to the Aboriginal and Torres Strait Islander members of our community by acknowledging the traditional owners of the land on which the Perth campus is located, the Whadjuk people of the Nyungar Nation; and on our Kalgoorlie campus, the Wongutha people of the North-Eastern Goldfields.