SWP-enabled constraints modeling for on-site assembly process of prefabrication housing production
Citation
Source Title
ISSN
Faculty
School
Funding and Sponsorship
Collection
Abstract
© 2019 Elsevier Ltd Prefabrication housing production (PHP) processes are fragmented and full of variability. Their schedule reliability is particularly disturbed by the constraints deriving from task executions in the on-site assembly process. Proactive constraints modeling, including identifying constraints and understanding their interrelationships, is crucial to ensure successful task executions and enhance sociability in collaborative working. However, current methods for constraints modeling are often sluggish and heavily rely on human's commitments because there is no real-time and value-added information for decision-making. To address this issue, this study proposes an approach of smart work packaging (SWP)-enabled constraints modeling service, which consists of three dynamic sub-services: social network analysis (SNA) service, hybrid system dynamics (SD)-discrete event simulation (DES) model service, and constraints scenario analysis service. It can equip the workers with the ability to (1) automatically identify the critical constraints, (2) dynamically explore interactional and interdependent relationships of these constraints, and (3) simulate and analyze the impact on schedule performance under different constraints scenarios. Five critical constraints are identified, including adverse weather conditions, lack of collision-free path planning, lack of visible and audible communication mechanism, lack of optimal buffer layout, and lack of optimal installation sequence. Most interrelationships are depicted in the four modules of the hybrid SD-DES model, including the assembly process, resource availability, operation efficiency, and schedule performance. Finally, the most influential constraint “lack of collision-free path planning” to schedule performance is identified in the constraints scenario analysis process.
Related items
Showing items related by title, author, creator and subject.
-
Nordin, Syarifah Zyurina (2011)Task scheduling in parallel processing systems is one of the most challenging industrial problems. This problem typically arises in the manufacturing and service industries. The task scheduling problem is to determine a ...
-
Burke, T.; Stone, J.; Glackin, S.; Scheurer, Jan (2014)Despite the plethora of rental research, a significant gap remains in understanding the relationship between rental housing and 'transport disadvantage'. This project analyses the changing spatial concentration of ...
-
Aizam, Nur Aidya Hanum (2013)Timetabling is a table of information showing when certain events are scheduled to take place. Timetabling is in fact very essential in making sure that all events occur in the time and place required. It is critical in ...