Relationship between BIM Implementation and Performance of OSM Projects
dc.contributor.author | Tang, X. | |
dc.contributor.author | Chong, Heap-Yih (John) | |
dc.contributor.author | Zhang, W. | |
dc.date.accessioned | 2020-05-20T01:24:51Z | |
dc.date.available | 2020-05-20T01:24:51Z | |
dc.date.issued | 2019 | |
dc.identifier.citation | Tang, X. and Chong, H.Y. and Zhang, W. 2019. Relationship between BIM Implementation and Performance of OSM Projects. Journal of Management in Engineering. 35 (5): Article No. 04019019. | |
dc.identifier.uri | http://hdl.handle.net/20.500.11937/79280 | |
dc.identifier.doi | 10.1061/(ASCE)ME.1943-5479.0000704 | |
dc.description.abstract |
© 2019 American Society of Civil Engineers. Building information modeling (BIM) and off-site manufacturing (OSM) approaches have been recognized as revolutionary methods in the construction industry. However, limited empirical studies have investigated the relations and effects of BIM in OSM projects. Hence, this study aims to explore the direct relationship between BIM implementation and the performance of OSM projects through their key influential factors. The empirical data were collected through questionnaires and analyzed using the partial least-squares technique. The results show there is a strong relationship between BIM implementation and the performance of OSM projects through integration management and cooperation behavior. Contract management plays a negative moderating effect on the relationship between integration management and the performance of OSM projects. These findings provide new insights into the detailed implementation strategies for BIM in improving OSM projects' performance through their correlated relations. This research also contributes to the effective promotion and use of BIM and OSM in the construction industry. | |
dc.language | English | |
dc.publisher | ASCE-AMER SOC CIVIL ENGINEERS | |
dc.subject | Science & Technology | |
dc.subject | Technology | |
dc.subject | Engineering, Industrial | |
dc.subject | Engineering, Civil | |
dc.subject | Engineering | |
dc.subject | Building information modeling (BIM) | |
dc.subject | Off-site manufacturing (OSM) | |
dc.subject | Integration management | |
dc.subject | Contract management | |
dc.subject | Partial least-squares technique | |
dc.subject | LIFE-CYCLE | |
dc.subject | JOINT VENTURE | |
dc.subject | MANAGEMENT | |
dc.subject | COOPERATION | |
dc.subject | PRODUCTIVITY | |
dc.subject | GOVERNANCE | |
dc.subject | FLEXIBILITY | |
dc.subject | CHALLENGES | |
dc.subject | STRATEGIES | |
dc.subject | EXCHANGES | |
dc.title | Relationship between BIM Implementation and Performance of OSM Projects | |
dc.type | Journal Article | |
dcterms.source.volume | 35 | |
dcterms.source.number | 5 | |
dcterms.source.issn | 0742-597X | |
dcterms.source.title | Journal of Management in Engineering | |
dc.date.updated | 2020-05-20T01:24:51Z | |
curtin.note |
This material may be downloaded for personal use only. Any other use requires prior permission of the American Society of Civil Engineers. This material may be found at https://doi.org/10.1061/(ASCE)ME.1943-5479.0000704 | |
curtin.department | School of Design and the Built Environment | |
curtin.accessStatus | Open access | |
curtin.faculty | Faculty of Humanities | |
curtin.contributor.orcid | Chong, Heap-Yih (John) [0000-0002-6080-7530] | |
curtin.contributor.researcherid | Chong, Heap-Yih (John) [M-8354-2017] | |
curtin.identifier.article-number | ARTN 04019019 | |
dcterms.source.eissn | 1943-5479 | |
curtin.contributor.scopusauthorid | Chong, Heap-Yih (John) [35091031600] |