Implementation of Parallel Synchronization Method of Generators for Power & Cost Saving in University of Gujrat
Citation
Source Title
ISSN
Faculty
School
Collection
Abstract
In the current economic and political scenario of Pakistan where new projects of Electrical generation seems impossible, one should adopt such means so as to minimize the power consumption via load management. In this paper a relatively better Electrical power system is proposed for University of Gujrat (UOG) power system. UOG runs its all generators whether it is full load or merely a load of 20 percent as a standby power. It is suggested that if generators system is synchronized and connected in parallel, it can not only minimize the cost, number of personnel required but also increase the reliability of the system. ETAP software is used for simulation and results show that by adopting this method generation cost can be reduced up to 30 percent which is indeed a huge figure. Losses and cable parameters were calculated using this software and found this proposal quite feasible.
Related items
Showing items related by title, author, creator and subject.
-
Lim, Pei Yi (2011)At present, there are still a large number of people living in isolated areas, particularly in developing countries, who have no immediate access to the main electricity grid. Most of the energy demands of these remote ...
-
Maticevic, Stjepan (2011)This work has focused on understanding the nature and impact of non-linear loads on isolated industrial power systems. The work was carried out over a period of 8 years on various industrial power systems: off-shore oil ...
-
Ladjavardi, Marjan (2008)This thesis investigates the impact of harmonics as a power quality issue on the dynamic behaviour of the power systems. The effectiveness of the power system stabilizers in distorted conditions is also investigated. This ...