Curtin University Homepage
  • Library
  • Help
    • Admin

    espace - Curtin’s institutional repository

    JavaScript is disabled for your browser. Some features of this site may not work without it.
    View Item 
    • espace Home
    • espace
    • Curtin Research Publications
    • View Item
    • espace Home
    • espace
    • Curtin Research Publications
    • View Item

    Developing work breakdown structure matrix for managing offsite construction projects

    Access Status
    Fulltext not available
    Authors
    Sutrisna, Monty
    Ramanayaka, Chamil Erik
    Goulding, J.S.
    Date
    2018
    Type
    Journal Article
    
    Metadata
    Show full item record
    Citation
    Sutrisna, M. and Ramanayaka, C.D.D. and Goulding, J.S. 2018. Developing work breakdown structure matrix for managing offsite construction projects. Architectural Engineering and Design Management. 14 (5): pp. 381-397.
    Source Title
    Architectural Engineering and Design Management
    DOI
    10.1080/17452007.2018.1477728
    ISSN
    1745-2007
    Faculty
    Faculty of Humanities
    School
    School of Design and the Built Environment
    URI
    http://hdl.handle.net/20.500.11937/84234
    Collection
    • Curtin Research Publications
    Abstract

    Offsite construction techniques continue to receive considerable attention in academic/research discourse. Whilst discourse in seminal literature critique the positive and negative aspects of offsite; on balance, the benefits outweigh the barriers, especially when fully integrated and managed. From a project management perspective, the techniques applied to construction projects typically commence in determining the project’s work breakdown structure (WBS). Whilst the WBS is applicable to offsite deliverables, reflecting site-based construction activities and concomitant dependencies with the manufacturing processes, there are slight discrepancies in processes, and equally, some areas of repetition and duplication. This mismatch has a fundamental impact on integration, creating pockets of confusion, where less seamless (sub-optimal) synergy between offsite and onsite works is lost. This is an acknowledged challenge. There is, therefore, a real need to retain the product breakdown structure, whilst ensuring a seamless interface with the onsite works is maintained. This is a challenge. Whilst the WBS-matrix has been implemented in the project management domain to bridge the ‘products’ and ‘activities’, this arrangement has not yet been developed for offsite building construction projects. This paper reports an on-going research project set up to implement WBS-matrix for offsite construction projects. Two cases of recently completed offsite construction building projects were studied to analyse current practices–to inform the way forward to further develop the WBS-matrix. Findings from this research provide clear guidance for practitioners involved in offsite construction projects; particularly on the development of the WBS-matrix for manufacturing deliverables/activities in order to more effectively manage offsite construction projects.

    Related items

    Showing items related by title, author, creator and subject.

    • Investigating the cost of offsite construction housing in Western Australia
      Sutrisna, M.; Cooper-Cooke, Barry ; Goulding, J.; Ezcan, V. (2019)
      Purpose: Offsite construction approaches and methodologies have been proffered a potential solution for controlling “traditional” projects, especially where high levels of complexity and uncertainty exist. Given this, ...
    • Constraints hindering the development of high-rise modular buildings
      Sun, Yanhui ; Wang, J.; Wu, Jeremy; Shi, Weixiang; Ji, Dazhi; Wang, Xiangyu ; Zhao, X. (2020)
      Licensee MDPI, Basel, Switzerland. Off-site construction has been increasingly employed due to its advantages, for instance, improved quality control, reduced skills labour, faster construction time, decreased material ...
    • Towards Assessing Productivity in Off-Site Building Methods for Engineering and Construction Projects
      Alazzaz, Faisal; Whyte, Andrew (2012)
      In the past few decades, the construction industry in many countries has suffered from poor performance and low productivity. The labour-intensive nature of the industry and diminishing levels of specialist skills and ...
    Advanced search

    Browse

    Communities & CollectionsIssue DateAuthorTitleSubjectDocument TypeThis CollectionIssue DateAuthorTitleSubjectDocument Type

    My Account

    Admin

    Statistics

    Most Popular ItemsStatistics by CountryMost Popular Authors

    Follow Curtin

    • 
    • 
    • 
    • 
    • 

    CRICOS Provider Code: 00301JABN: 99 143 842 569TEQSA: PRV12158

    Copyright | Disclaimer | Privacy statement | Accessibility

    Curtin would like to pay respect to the Aboriginal and Torres Strait Islander members of our community by acknowledging the traditional owners of the land on which the Perth campus is located, the Whadjuk people of the Nyungar Nation; and on our Kalgoorlie campus, the Wongutha people of the North-Eastern Goldfields.