Dynamic on-bench loading location optimisation of explosive trucks for short-term mine planning
Citation
Source Conference
Faculty
School
Collection
Abstract
The mining industry is progressing steadily toward operation optimisation, with drill-and-blast operations presenting significant challenges in this transition. Many mining processes still require optimisation especially for mine sites with a substantial geographic spread. One such process, which consumes substantial time and resources, involves traveling distance for charging blastholes using Mobile Processing Units (MPUs) and re-loading MPUs at facilities which may not be in proximity to the charging location. This study introduces an innovative programming tool designed to optimise the number of MPUs and their routes within a pit, taking into account factors such as explosive types and MPU capacities based on the provided mine plan inputs. Additionally, the tool employs a Genetic Algorithm (GA) and satellite road networking mapping to determine the optimal on-bench loading locations for multiple pits, minimising travel distances between MPUs, pits, on-bench loading areas, and magazines. The tool was tested over four consecutive six month periods of the mine plan for Fortescue, demonstrating significant reductions in travel distances, thus providing the potential to minimise operational costs.
Related items
Showing items related by title, author, creator and subject.
-
Fava, L.; Maybee, Bryan; Millar, D. (2012)In the context of a case study for an underground gold mine, the value generated by a schedule optimisation tool (SOT) is assessed. SOT is a software tool for underground mine planning that maximises the net present value ...
-
Besa, Bunda (2010)The decline is a major excavation in metalliferous mining since it provides the main means of access to the underground and serves as a haulage route for underground trucks. However, conventional mining of the decline to ...
-
Burt, Christina Naomi (2008)In the surface mining industry the equipment selection problem involves choosing a fleet of trucks and loaders that have the capacity to move the materials specified in the mine plan. The optimisation problem is to select ...