Assessing The Reliability Of System Modules Used In Multiple Lifecycles
Access Status
Authors
Date
2009Type
Metadata
Show full item recordCitation
Source Title
Source Conference
ISBN
Faculty
Remarks
The original publication is available at : http://www.springerlink.com
Collection
Abstract
This paper presents a reliability assessment model for maintenance and reliability engineers to determine the reusability potential of system modules based on their operating lives and, the pre-determined lifecycle of the parent product. In the first phase, the paper considers the time-to-failure of system modules to determine their overall operating life under normal operating conditions. Then, it determines the maximum number of lifecycles of the modules under consideration, which is a function of the modules total functional life and the product lifecycle. The functional potential of the modules is then discussed with reference to the probability of their failure. The study employs Weibull analysis for carrying out this analysis. The methodology was validated by using lifecycle data from a consumer product. The findings show that some of the components/modules of the product have a remarkable amount of residual life, which can be utilized by reusing these components in the next generation of the product. The results demonstrate the effectiveness and practicality of this multiple-use strategy. The study provides more perspectives to future research in the field of reliability, and decision-making on maintenance management and value recovery through multiple uses of system modules.
Related items
Showing items related by title, author, creator and subject.
-
Friesen, M.; Lan, Q.; Ge, C.; Locke, S.; Hosgood, D.; Fritschi, Lin; Sadkowsky, T.; Chen, Y.; Wei, H.; Xu, J.; Lam, T.; Kwong, Y.; Chen, K.; Xu, C.; Su, Y.; Chiu, B.; Ip, K.; Purdue, M.; Bassig, B.; Rothman, N.; Vermeulen, R. (2016)Objective: In community-based epidemiological studies, job-and industry-specific 'modules' are often used to systematically obtain details about the subject's work tasks. The module assignment is often made by the ...
-
Hasan, Umair; Whyte, Andrew ; Al Jassmi, H. (2019)Life-cycle management of road network projects traditionally emphasise material production and construction stages, with less attention given to usage stage and functionality improvement. Increasingly there is a need to ...
-
Kozyrskyj, A.; Kendall, Garth; Zubrick, Stephen; Newnham, J.; Sly, Peter (2009)Frequent nocturnal awakening in early life is associated with nonatopic asthma in children Holdings more options Author(s): Kozyrskyj AL (Kozyrskyj, A. L.)1,2, Kendall GE (Kendall, G. E.)3,4,6, Zubrick SR ...