Curtin University Homepage
  • Library
  • Help
    • Admin

    espace - Curtin’s institutional repository

    JavaScript is disabled for your browser. Some features of this site may not work without it.
    View Item 
    • espace Home
    • espace
    • Curtin Research Publications
    • View Item
    • espace Home
    • espace
    • Curtin Research Publications
    • View Item

    Benefits of Building Information Modelling in the Project Lifecycle: Construction Projects in Asia

    227035_160866_PUB-HUM-SBE-JG-88849-1.pdf (755.1Kb)
    Access Status
    Open access
    Authors
    Li, J.
    Wang, Ying
    Wang, Xiangyu
    Luo, H.
    Kang, S.
    Wang, Jun
    Guo, J.
    Jiao, Y.
    Date
    2014
    Type
    Journal Article
    
    Metadata
    Show full item record
    Citation
    Li, J. and Wang, Y. and Wang, X. and Luo, H. and Kang, S. and Wang, J. and Guo, J. et al. 2014. Benefits of Building Information Modelling in the Project Lifecycle: Construction Projects in Asia. International Journal of Advanced Robotic Systems. 11: Article ID 124.
    Source Title
    International Journal of Advanced Robotic Systems
    DOI
    10.5772/58447
    ISSN
    1729-8806
    School
    School of Built Environment
    Remarks

    This open access article is distributed under the Creative Commons license http://creativecommons.org/licenses/by/3.0

    URI
    http://hdl.handle.net/20.500.11937/17905
    Collection
    • Curtin Research Publications
    Abstract

    Building Information Modelling (BIM) is a process involving the creation and management of objective data with property, unique identity and relationship. In the Architecture, Engineering and Construction (AEC) industry, BIM is adopted a lot in the lifecycle of buildings because of the high integration of information that it enables. Four-dimensional (4D) computer-aided design (CAD) has been adopted for many years to improve the construction planning process. BIM is adopted throughout buildings’ lifecycles, in design, construction and operation. This paper presents five large-scale public and financial projects that adopt BIM in the design, construction and operational phases. Different uses of BIM are compared and contrasted in the context of the separate backgrounds. It is concluded that productivity is improved where BIM is used to enable easy sharing and integration of information and convenient collaboration.

    Related items

    Showing items related by title, author, creator and subject.

    • Constraints hindering the development of high-rise modular buildings
      Sun, Yanhui ; Wang, J.; Wu, Jeremy; Shi, Weixiang; Ji, Dazhi; Wang, Xiangyu ; Zhao, X. (2020)
      Licensee MDPI, Basel, Switzerland. Off-site construction has been increasingly employed due to its advantages, for instance, improved quality control, reduced skills labour, faster construction time, decreased material ...
    • Integrating mobile Building Information Modelling and Augmented Reality systems: An experimental study
      Chu, M.; Matthews, J.; Love, Peter (2018)
      © 2017 The benefits of Building Information Modelling (BIM) have typically been tied to its capability to support information structuring and exchange through the centralization of information. Its increasing adoption and ...
    • A Conceptual Framework of Quality-Assured Fabrication, Delivery and Installation Processes for Liquefied Natural Gas (LNG) Plant Construction
      Chi, Hung-Lin; Wang, J.; Wang, Xiangyu; Truijens, M.; Yung, P. (2015)
      © 2014, Springer Science+Business Media Dordrecht. Construction productivity issues in the Liquefied Natural Gas (LNG) construction industry can lead to project cost blowouts. Time wasted by construction personnel getting ...
    Advanced search

    Browse

    Communities & CollectionsIssue DateAuthorTitleSubjectDocument TypeThis CollectionIssue DateAuthorTitleSubjectDocument Type

    My Account

    Admin

    Statistics

    Most Popular ItemsStatistics by CountryMost Popular Authors

    Follow Curtin

    • 
    • 
    • 
    • 
    • 

    CRICOS Provider Code: 00301JABN: 99 143 842 569TEQSA: PRV12158

    Copyright | Disclaimer | Privacy statement | Accessibility

    Curtin would like to pay respect to the Aboriginal and Torres Strait Islander members of our community by acknowledging the traditional owners of the land on which the Perth campus is located, the Whadjuk people of the Nyungar Nation; and on our Kalgoorlie campus, the Wongutha people of the North-Eastern Goldfields.