    Integrated short and medium term underground mine production scheduling

    190755_77122_v112n05p365.pdf (1.140Mb)
    Access Status
    Open access
    Authors
    Nehring, M.
    Topal, Erkan
    Knights, P.
    Kizil, M.
    Date
    2012
    Type
    Journal Article
    
    Metadata
    Show full item record
    Citation
    Nehring, M. and Topal, E. and Knights, P. and Kizil, M. 2012. Integrated short and medium term underground mine production scheduling. South African Institute of Mining and Metallurgy Journal (SAIMM). 112 (5): pp. 365-379.
    Source Title
    South African Institute of Mining and Metallurgy Journal (SAIMM)
    Additional URLs
    http://www.saimm.co.za/Journal/v112n05p365.pdf
    ISSN
    2225-6253
    Remarks

    Copyright © 2012 Southern African Institute of Mining and Metallurgy (SAIMM) http://www.saimm.co.za/

    URI
    http://hdl.handle.net/20.500.11937/24263
    Collection
    • Curtin Research Publications
    Abstract

    The development of short- and medium-term mine production schedules in isolation from each other has meant that only a local optimum can be achieved when each scheduling phase is carried out. The globally optimal solution, however, can be achieved when integrating scheduling phases and accounting for the interaction between short-term and medium-term activities simultaneously. This paper addresses the task of integrating short- and medium term production plans by combining the short-term objective of minimizing deviation from targeted mill feed grade with the medium-term objective of maximizing net present value (NPV) into a single mathematical optimization model. A conceptual sublevel stoping operation comprising 30 stopes is used for trialling segregated and integrated scheduling approaches. Segregated medium- and short-term scheduling using separate models achieved an NPV of $42 654 456. The final scheduling approach involved integrating the two scheduling horizons using the newly-developed globally optimal integrated production scheduling model to achieve an NPV of $42 823 657 with smoother mill feed grade. The larger the stope data set, the larger the difference between the two scheduling approaches is likely to be. At the very least, an integrated approach ensures feasibility across the two scheduling horizons, which cannot always be assumed when using a segregated approach.

    Related items

    Showing items related by title, author, creator and subject.

    • An Investigation to Integrate Optimum Long-Term Planning with Short Planning in Underground Mine Production Scheduling
      Topal, Erkan; Nehring, M.; Kizil, M.; Knights, P. (2010)
      Generating short- and long-term mine production schedules in isolation and independently from each other means that only a local optimum can be achieved when each scheduling phase is carried out. The globally optimal ...
    • Integrated Optimization of Underground Mine Design and Scheduling
      Little, J; Knights, P; Topal, Erkan (2013)
      It is common practice for underground mine plans to be created sequentially, where results from one planning process form the input data for another. While this is practical for manual methods, computerized optimization ...
    • Effective computational models for timetabling problem
      Aizam, Nur Aidya Hanum (2013)
      Timetabling is a table of information showing when certain events are scheduled to take place. Timetabling is in fact very essential in making sure that all events occur in the time and place required. It is critical in ...
    Advanced search

    Browse

    Communities & CollectionsIssue DateAuthorTitleSubjectDocument TypeThis CollectionIssue DateAuthorTitleSubjectDocument Type

    My Account

    Admin

    Statistics

    Most Popular ItemsStatistics by CountryMost Popular Authors

    Follow Curtin

    • 
    • 
    • 
    • 
    • 

    CRICOS Provider Code: 00301JABN: 99 143 842 569TEQSA: PRV12158

    Copyright | Disclaimer | Privacy statement | Accessibility

    Curtin would like to pay respect to the Aboriginal and Torres Strait Islander members of our community by acknowledging the traditional owners of the land on which the Perth campus is located, the Whadjuk people of the Nyungar Nation; and on our Kalgoorlie campus, the Wongutha people of the North-Eastern Goldfields.