Integrated Optimization of Underground Mine Design and Scheduling
Access Status
Authors
Date
2013Type
Metadata
Show full item recordCitation
Source Title
Additional URLs
ISSN
Remarks
Copyright © 2013 The Southern African Institute of Mining and Metallurgy
Collection
Abstract
It is common practice for underground mine plans to be created sequentially, where results from one planning process form the input data for another. While this is practical for manual methods, computerized optimization techniques should consider an integrated approach to creating the global mine plan. This is because optimizing an individual mine planning process, such as stope layouts, introduces a likelihood of increasing costs or decreasing revenues associated with other areas, such as production scheduling, as harmful decisions must be balanced. Considering the interaction and influence that individual underground mine planning processes have on each other during optimization will provide more profitable results than if these are ignored. Optimization techniques for stope layouts and production scheduling are reviewed. An integer programming model is proposed that allows for either integrated or isolated optimization. Both approaches are separately applied to a block model. The results demonstrate the model’s ability to produce optimal long-term sublevel stoping mine plans and the benefits of using an integrated approach.
Related items
Showing items related by title, author, creator and subject.
-
Little, J.; Topal, Erkan; Knights, P. (2011)Optimisation techniques for underground metalliferous mine design and planning are not commonplace like their open cut counterpart. Optimisation studies which have focused on underground design and planning are amenable ...
-
Erdogan, G.; Cigla, M.; Topal, Erkan; Yavuz, M. (2017)Deeper deposits become the future of mining as an increasing amount of shallow deposits are exploited. Consequently, the mining industry is being forced to extract minerals from deeper deposits using underground mining ...
-
Nehring, M.; Topal, Erkan; Knights, P.; Kizil, M. (2012)The development of short- and medium-term mine production schedules in isolation from each other has meant that only a local optimum can be achieved when each scheduling phase is carried out. The globally optimal solution, ...