Curtin University Homepage
  • Library
  • Help
    • Admin

    espace - Curtin’s institutional repository

    JavaScript is disabled for your browser. Some features of this site may not work without it.
    View Item 
    • espace Home
    • espace
    • Curtin Research Publications
    • View Item
    • espace Home
    • espace
    • Curtin Research Publications
    • View Item

    A review of methods and algorithms for optimizing construction scheduling

    Access Status
    Open access via publisher
    Authors
    Zhou, Jingyang
    Love, Peter
    Wang, Xiangyu
    Teo, Kok Lay
    Irani, Zahir
    Date
    2013
    Type
    Journal Article
    
    Metadata
    Show full item record
    Citation
    Zhou, Jingyang and Love, Peter and Wang, Xiangyu and Teo, Kok Lay and Irani, Zahir. 2013. A review of methods and algorithms for optimizing construction scheduling. Journal of the Operational Research Society. 64 (8): pp. 1091-1105.
    Source Title
    Journal of the Operational Research Society
    DOI
    10.1057/jors.2012.174
    ISSN
    0160-5682
    URI
    http://hdl.handle.net/20.500.11937/26309
    Collection
    • Curtin Research Publications
    Abstract

    Optimizing construction project scheduling has received a considerable amount of attention over the past 20 years. As a result, a plethora of methods and algorithms have been developed to address specific scenarios or problems. A review of the methods and algorithms that have been developed to examine the area of construction schedule optimization (CSO) is undertaken. The developed algorithms for solving the CSO problem can be classified into three methods: mathematical, heuristic and metaheuristic. The application of these methods to various scheduling problems is discussed and implications for future research are identified.

    Related items

    Showing items related by title, author, creator and subject.

    • Task scheduling in parallel processor systems
      Nordin, Syarifah Zyurina (2011)
      Task scheduling in parallel processing systems is one of the most challenging industrial problems. This problem typically arises in the manufacturing and service industries. The task scheduling problem is to determine a ...
    • Study on construction material allocation policies: A simulation optimization method
      Lu, H.; Wang, H.; Xie, Y.; Wang, Xiangyu (2018)
      Due to uncertainty in both demand and supply, material shortages are difficult to completely avoid. To reduce the effect on the schedule and cost performance of construction projects, managers should allocate limited ...
    • Global algorithms for nonlinear discrete optimization and discrete-valued optimal control problems
      Woon, Siew Fang (2009)
      Optimal control problems arise in many applications, such as in economics, finance, process engineering, and robotics. Some optimal control problems involve a control which takes values from a discrete set. These problems ...
    Advanced search

    Browse

    Communities & CollectionsIssue DateAuthorTitleSubjectDocument TypeThis CollectionIssue DateAuthorTitleSubjectDocument Type

    My Account

    Admin

    Statistics

    Most Popular ItemsStatistics by CountryMost Popular Authors

    Follow Curtin

    • 
    • 
    • 
    • 
    • 

    CRICOS Provider Code: 00301JABN: 99 143 842 569TEQSA: PRV12158

    Copyright | Disclaimer | Privacy statement | Accessibility

    Curtin would like to pay respect to the Aboriginal and Torres Strait Islander members of our community by acknowledging the traditional owners of the land on which the Perth campus is located, the Whadjuk people of the Nyungar Nation; and on our Kalgoorlie campus, the Wongutha people of the North-Eastern Goldfields.