Show simple item record

dc.contributor.authorZhou, Jingyang
dc.contributor.authorLove, Peter
dc.contributor.authorWang, Xiangyu
dc.contributor.authorTeo, Kok Lay
dc.contributor.authorIrani, Zahir
dc.date.accessioned2017-01-30T12:52:47Z
dc.date.available2017-01-30T12:52:47Z
dc.date.created2014-03-09T20:00:40Z
dc.date.issued2013
dc.identifier.citationZhou, Jingyang and Love, Peter and Wang, Xiangyu and Teo, Kok Lay and Irani, Zahir. 2013. A review of methods and algorithms for optimizing construction scheduling. Journal of the Operational Research Society. 64 (8): pp. 1091-1105.
dc.identifier.urihttp://hdl.handle.net/20.500.11937/26309
dc.identifier.doi10.1057/jors.2012.174
dc.description.abstract

Optimizing construction project scheduling has received a considerable amount of attention over the past 20 years. As a result, a plethora of methods and algorithms have been developed to address specific scenarios or problems. A review of the methods and algorithms that have been developed to examine the area of construction schedule optimization (CSO) is undertaken. The developed algorithms for solving the CSO problem can be classified into three methods: mathematical, heuristic and metaheuristic. The application of these methods to various scheduling problems is discussed and implications for future research are identified.

dc.publisherPalgrave MacMillan
dc.subjectscheduling
dc.subjectoptimization
dc.subjectconstruction
dc.subjectalgorithm
dc.titleA review of methods and algorithms for optimizing construction scheduling
dc.typeJournal Article
dcterms.source.volume64
dcterms.source.number8
dcterms.source.startPage1091
dcterms.source.endPage1105
dcterms.source.issn0160-5682
dcterms.source.titleJournal of the Operational Research Society
curtin.department
curtin.accessStatusOpen access via publisher


Files in this item

Thumbnail

This item appears in the following Collection(s)

Show simple item record