Determining the probability distribution of rework costs in construction and engineering projects
Access Status
Authors
Date
2013Type
Metadata
Show full item recordCitation
Source Title
ISSN
Collection
Abstract
Rework arises due to design errors, changes and omissions during design and has been found to contribute to 52% of a project’s cost overrun. The statistical characteristics of rework costs experienced from contract award in 276 construction and engineering projects were analysed. The skewness and kurtosis values of rework costs are computed to determine if the empirical distribution of the data follows a normal distribution. The empirical distributions for rework costs are found to be non-Gaussian. Theoretical probability distributions are fitted to the rework data. The Kolmogorov–Smirnov and Anderson–Darling non-parametric tests are used to determine the ‘Goodness of Fit’ of the selected probability distributions. A Generalised Pareto probability function is found to provide the best overall distribution fit for rework costs. The Generalised Pareto distribution is used to calculate the probability of rework being experienced for the selected sample. Projects with a contract value 5A$1million hadhigher rework probabilities than that of 4A$101 million. Larger projects may be better managed and longercompletion times provide an opportunity to make adjustments to facilitate cost control. The anticipation thatrework will occur using the probabilities that are derived can enable a quantitative risk assessment to be undertakenprior to the commencement of construction.
Related items
Showing items related by title, author, creator and subject.
-
Simpeh, E.; Ndihokubwayo, R.; Love, Peter; Thwala, W. (2015)© 2015 Taylor & Francis. Statistical methods for eliciting probability distributions were used to analyse the data collected from 78 construction professionals. The empirical distributions for rework costs were found to ...
-
Love, Peter; Sing, Michael; Wang, Xiangyu; Irani, Z.; Thwala, D. (2014)Transportation infrastructure projects are prone to cost and schedule overruns. At the time of contract award, a construction contingency budget is often used to accommodate for unplanned events such as scope changes. ...
-
Love, Peter; Sing, C.; Carey, B.; Kim, J. (2015)© 2014 American Society of Civil Engineers. The determination of a project's cost contingency is a pervasive problem as the amount that is incorporated into an estimate is invariably insufficient to accommodate a project's ...