Integrated distribution systems planning to improve reliability under load growth
Access Status
Authors
Date
2012Type
Metadata
Show full item recordCitation
Source Title
ISSN
Collection
Abstract
Abstract—In this paper, an integrated methodology is proposed for planning distribution networks in which the operation of distributed generators (DGs) and cross-connections (CCs) is optimally planned. Distribution lines and high-voltage/medium-voltage (HV/MV) transformers are also optimally upgraded in order to improve system reliability and to minimize line losses under load growth. An objective functionis constituted, composed of the investment cost, loss cost, and reliability cost. The energy savings that result from installing DGs is also included in this function. The bus voltage and line currentare maintained within their standard bounds as constraints. DG output power is used as another constraint, where this should not be less than 30% of the generator’s rated power; otherwise,the unit is not switched on. The modified discrete particle swarm optimization (PSO) method is employed in this paper for optimizing this planning problem. To evaluate the proposed approach,the distribution system connected to bus 4 of the Roy Billinton test system is used. Four different scenarios are assessed. In the first scenario, a basic planning approach is studied. In thesecond scenario, the use of DG is planned to avoid the line and transformer upgrading. In the third scenario, CC-based planning is studied when no DG exists. Finally, the proposed technique, inwhich all technologies are included, is investigated in the fourth scenario. The outcomes demonstrate that the lowest cost plan results when all technologies are incorporated as proposed in this paper. A study is performed to evaluate the accuracy and robustness of the proposed PSO-based optimization method. The results highlight the applicability of this method for solving the distribution network planning problem.
Related items
Showing items related by title, author, creator and subject.
-
Ziari, I.; Ledwich, G.; Ghosh, Arindam; Platt, G. (2011)In this paper, the optimal location and output power of Distributed Generators (DGs) along with the location and type of cross-connections are determined as the transformer and feeders are optimally upgraded. These are ...
-
Ziari, I.; Ledwich, G.; Ghosh, Arindam; Platt, G. (2011)In this paper, a comprehensive planning methodology is proposed that can minimize the line loss, maximize the reliability and improve the voltage profile in a distribution network. The injected active and reactive power ...
-
Ziari, I.; Ledwich, G.; Ghosh, Arindam; Platt, G. (2010)PrintIn this paper, both Distributed Generators (DG) and capacitors are allocated and sized optimally for improving line loss and reliability. The objective function is composed of the investment cost of DGs and capacitors ...