    Overrun causations under advance payment regimes

    Access Status
    Fulltext not available
    Authors
    Aje, O.
    Olatunji, Oluwole
    Olalusi, O.
    Date
    2017
    Type
    Journal Article
    
    Metadata
    Show full item record
    Citation
    Aje, O. and Olatunji, O. and Olalusi, O. 2017. Overrun causations under advance payment regimes. Built Environment Project and Asset Management. 7 (1): pp. 86-98.
    Source Title
    Built Environment Project and Asset Management
    DOI
    10.1108/BEPAM-06-2015-0028
    ISSN
    2044-124X
    School
    Department of Construction Management
    URI
    http://hdl.handle.net/20.500.11937/49990
    Collection
    • Curtin Research Publications
    Abstract

    Purpose: Evidence suggests project owners could use advance payments to prevent cost escalations. The purpose of this paper is to elicit the relationships between causations of overruns when advance payments are issued to contractors. Design/methodology/approach: In total, 97 responses from a questionnaire survey were analysed. Additional data on 51 projects, completed between 2000 and 2014 under different advance payments regimes, were also obtained and analysed. Findings: Project owners issue advance payments to contractors so as to avoid delays. However, statistical correlation between advance payments and overrun causations are not significant. Although cost overruns were higher in large projects than in small projects, schedule overruns were more in small projects than in large projects. Schedule overruns were caused most significantly by contractors’ site management approaches. Design and documentation issues were identified as the most prevalent cause of cost overruns. Regression models are proposed to elicit overruns when advance payments are issued. Practical implications: Extant debates on project overruns in construction and project management literature are robust. Nonetheless, the study elicits considerable knowledge gaps regarding the roles of advance payments in fostering project performance. Originality/value: This pioneering work indexes the relationship between advance payment and project overruns in Nigeria. It is also the first attempt to document the probability distribution of overruns in Nigeria, particularly under specific advance payment regimes.

    Related items

    Showing items related by title, author, creator and subject.

    • Spotlight on construction cost overrun research: Superficial, replicative and stagnated
      Ahiaga-Dagbui, D.; Smith, S.; Love, Peter; Ackermann, Fran (2015)
      Construction projects routinely overrun their cost estimates. A plethora of studies have thus been dedicated to investigating the root causes, sizes, distribution and nature of overruns. The causes range from a poor ...
    • Cost overruns in transportation infrastructure projects: Sowing the seeds for a probabilistic theory of causation
      Love, Peter; Ahiaga-Dagbui, D.; Irani, Z. (2016)
      © 2016 Elsevier LtdUnderstanding the cause of cost overruns in transportation infrastructure projects has been a topic that has received considerable attention from academics and the popular press. Despite studies providing ...
    • Choosing Appropriate Contract Methods for Design-Build Projects
      Chen, Q.; Xia, B.; Jin, Z.; Wu, Peng; Hu, Y. (2016)
      For design-build (DB) projects, owners normally use lump sum and guaranteed maximum price (GMP) as the major contract payment provisions. However, there was a lack of empirical studies to compare the project performance ...
    Advanced search

    Browse

    Communities & CollectionsIssue DateAuthorTitleSubjectDocument TypeThis CollectionIssue DateAuthorTitleSubjectDocument Type

    My Account

    Admin

    Statistics

    Most Popular ItemsStatistics by CountryMost Popular Authors

    Follow Curtin

    • 
    • 
    • 
    • 
    • 

    CRICOS Provider Code: 00301JABN: 99 143 842 569TEQSA: PRV12158

    Copyright | Disclaimer | Privacy statement | Accessibility

    Curtin would like to pay respect to the Aboriginal and Torres Strait Islander members of our community by acknowledging the traditional owners of the land on which the Perth campus is located, the Whadjuk people of the Nyungar Nation; and on our Kalgoorlie campus, the Wongutha people of the North-Eastern Goldfields.