Purpose: This paper aims to identify the main non-cost factors affecting accurate estimation of life cycle cost (LCC) in building projects. Design/methodology/approach: Ten factors affecting LCC in building project cost estimates are identified through literature and interviews. A questionnaire survey is conducted to rank these factors in order of priority and provide the views of cost practitioners about the significance of these factors in the accurate estimation of LCC. The data from 138 construction building projects completed in UK were collected and analysed via multiple regression to discover the relationship between capital and LCCs and between non-cost factors and cost estimation at each stage of the life cycle (capital, operation, maintenance and LCC). Findings: The results of analysis of existing LCC data of completing project and survey data from cost professionals are mostly consistent with many literature views and provide a reasonable description of the non-cost factors affecting the accuracy of estimates. Originality/value: The value of this study is in the method used, which involves analysis of existing life data and survey data from cost professionals. The results provide a plausible description of the non-cost factors affecting the accuracy of estimates.
Related items
Showing items related by title, author, creator and subject.
-
Alqahtani, Ayedh; Whyte, Andrew (2013)Industrial application of life-cycle cost analysis (LCCA) is somewhat limited, with techniques deemed overly theoretical, resulting in a reluctance to realise (and pass onto the client) the advantages to be gained from ...
-
Alqahtani, Ayedh; Whyte, Andrew (2016)Purpose – The purpose of this paper is to compare the performance of regression and artificial-neural-networks (ANNs) methods to estimate the running cost of building projects towards improved accuracy. Design/methodolo ...
-
Shiyab, Adnan M S H (2007)This study aimed at investigating the current practices and methods adopted by roads agencies around the world with regard to collection, analysis and utilization of the data elements pertaining to the main pavement ...