Show simple item record

dc.contributor.authorZiari, I.
dc.contributor.authorLedwich, G.
dc.contributor.authorGhosh, Arindam
dc.contributor.authorPlatt, G.
dc.contributor.editorInstitute of Electrical Engineers Inc
dc.date.accessioned2017-01-30T10:51:08Z
dc.date.available2017-01-30T10:51:08Z
dc.date.created2015-04-23T03:53:29Z
dc.date.issued2011
dc.identifier.citationZiari, I. and Ledwich, G. and Ghosh, A. and Platt, G. 2011. Planning of distribution networks in presence of Distributed Generators and cross-connections, in Institute of Electrical Engineers Inc (ed), IECON 2011 – 37th Annual Conference of the IEEE Industrial Electronics Society, Nov 7 2011, pp. 3719-3724. Melbourne: Institute of Electrical and Electronics Engineers.
dc.identifier.urihttp://hdl.handle.net/20.500.11937/6165
dc.identifier.doi10.1109/IECON.2011.6119914
dc.description.abstract

In this paper, the optimal location and output power of Distributed Generators (DGs) along with the location and type of cross-connections are determined as the transformer and feeders are optimally upgraded. These are all to improve system reliability and to minimize line losses under load growth. Given this, an objective function is constituted, composed of the investment cost, loss cost, reliability cost, and the energy saving resulting from DG injection. As constraints, the bus voltage, line current, and DG power are maintained within their bounds. The modified discrete particle swarm optimization method is employed in this paper for optimizing this planning problem. The distribution system, connected to bus 4 of the Roy Billinton test system, is used to evaluate the proposed technique. Three different scenarios are assessed. In the first scenario, a basic planning approach is studied. In the second scenario, the use of DG is planned to avoid extra line and transformer upgrades. Finally, the proposed technique, in which all technologies are included, is investigated in the third scenario. The outcomes demonstrate that the lowest cost plan results when all technologies are incorporated as proposed in this work.

dc.publisherInstitute of Electrical and Electronics Engineers
dc.titlePlanning of distribution networks in presence of Distributed Generators and cross-connections
dc.typeConference Paper
dcterms.source.startPage3719
dcterms.source.endPage3724
dcterms.source.titleIECON 2011 - 37th Annual Conference on IEEE Industrial Electronics Society
dcterms.source.seriesIECON 2011 - 37th Annual Conference on IEEE Industrial Electronics Society
dcterms.source.isbn978-161284972-0
dcterms.source.conferenceIECON 2011 – 37th Annual Conference of the IEEE Industrial Electronics Society
dcterms.source.conference-start-dateNov 7 2011
dcterms.source.conferencelocationMelbourne
dcterms.source.placeUS
curtin.accessStatusFulltext not available


Files in this item

Thumbnail

This item appears in the following Collection(s)

Show simple item record