A new risk-based optimisation method for the iron ore production scheduling using stochastic integer programming
Access Status
Authors
Date
2018Type
Metadata
Show full item recordCitation
Source Title
ISSN
School
Collection
Abstract
Stochastic integer programming (SIP) has recently been studied to manage the risk caused by geological uncertainty when solving mine planning and production scheduling problems of open pit mines. However, similar to other mathematical programming techniques that deploy integer variables, the main obstacle of applying SIP on real-life datasets stems from the enormous number of integer variables required by its mathematical formulation, which is a function of number of mining blocks being processed and lifespan of the mining project. In this paper, a new framework is proposed for stochastic mine planning process which makes the application of SIP on large-scale datasets tractable. Firstly, mining blocks of simulated orebody models are clustered using TopCone algorithm to significantly reduce the scale of the data. A new SIP model is then developed to work on aggregated blocks so not only the net present value (NPV) is maximised and the risk of not meeting production targets is minimised, but also solution can be obtained in a practical timeframe. The scheduling result of the new SIP model is also compared to an integer programming (IP) model to highlight the ability to manage risk and generating higher NPV on a case study of a large-scale multi-element iron ore deposit in Pilbara region, Western Australia.
Related items
Showing items related by title, author, creator and subject.
-
Burt, Christina Naomi (2008)In the surface mining industry the equipment selection problem involves choosing a fleet of trucks and loaders that have the capacity to move the materials specified in the mine plan. The optimisation problem is to select ...
-
Groeneveld, B.; Topal, Erkan; Leenders, B. (2018)© The Australasian Institute of Mining and Metallurgy 2018. All rights are reserved. Uncertainty and risk are invariably embedded in every mining project. Mining companies endeavouring to maximise their return for ...
-
Li, Y.; Topal, Erkan; Williams, D. (2012)A mine waste rock dump does not have any intrinsic value, yet is an inevitable structure in surface mining operations. Since the purpose of mining is to maximise profit, possible expenditure reduction in hauling waste ...