Joint Contract-Function Effects on BIM-Enabled EPC Project Performance
dc.contributor.author | Lee, C.Y. | |
dc.contributor.author | Chong, Heap-Yih (John) | |
dc.contributor.author | Li, Q. | |
dc.contributor.author | Wang, Xiangyu | |
dc.date.accessioned | 2020-05-20T01:12:27Z | |
dc.date.available | 2020-05-20T01:12:27Z | |
dc.date.issued | 2020 | |
dc.identifier.citation | Lee, C.Y. and Chong, H.Y. and Li, Q. and Wang, X. 2020. Joint Contract-Function Effects on BIM-Enabled EPC Project Performance. Journal of Construction Engineering and Management. 146 (3): Article No. 04020008. | |
dc.identifier.uri | http://hdl.handle.net/20.500.11937/79278 | |
dc.identifier.doi | 10.1061/(ASCE)CO.1943-7862.0001766 | |
dc.description.abstract |
© 2020 American Society of Civil Engineers. Engineering, procurement, and construction (EPC) contracting does not promote collaboration and thus may not be suitable for building information modeling (BIM) projects. Joint-contract functions that combine contractual control, coordination, and contingency adaptability may positively influence the performance of these BIM-enabled projects. This study hypothesized that perceived fairness, calculative trust, relational trust, and positive outcomes of distrust influence the relationship between joint-contract functions and BIM-enabled project performance. A total of 252 observations were collected from industry practitioners in EPC oil and gas projects and analyzed using partial least-squares structural equation modeling (PLS-SEM). The results show no direct effect of joint-contract functions on BIM-enabled EPC project performance but do show significant total and indirect relationship effects that are influenced by perceived fairness and relational trust. The findings contribute to construction contracting research by empirically showing how formal contracts focusing on joint-contract functions can influence BIM-enabled EPC project performance. The current findings also shed light on appropriate contract framing for BIM-enabled EPC project stakeholders, an area not explored in the previous literature. | |
dc.language | English | |
dc.publisher | ASCE-AMER SOC CIVIL ENGINEERS | |
dc.relation.sponsoredby | http://purl.org/au-research/grants/arc/DP170104612 | |
dc.relation.sponsoredby | http://purl.org/au-research/grants/arc/LP140100873 | |
dc.rights.uri | http://creativecommons.org/licenses/by/4.0/ | |
dc.subject | Science & Technology | |
dc.subject | Technology | |
dc.subject | Construction & Building Technology | |
dc.subject | Engineering, Industrial | |
dc.subject | Engineering, Civil | |
dc.subject | Engineering | |
dc.subject | Contract functions | |
dc.subject | Control | |
dc.subject | Coordination | |
dc.subject | Contingency adaptability | |
dc.subject | Trust | |
dc.subject | Distrust | |
dc.subject | Building information modeling (BIM) | |
dc.subject | procurement | |
dc.subject | and construction (EPC) | |
dc.subject | CONSTRUCTION PROJECTS | |
dc.subject | INTERPERSONAL-TRUST | |
dc.subject | TRANSACTION COSTS | |
dc.subject | MEDIATING ROLE | |
dc.subject | GOVERNANCE | |
dc.subject | COLLABORATION | |
dc.subject | UNCERTAINTY | |
dc.subject | COOPERATION | |
dc.subject | DISTRUST | |
dc.subject | VARIANCE | |
dc.title | Joint Contract-Function Effects on BIM-Enabled EPC Project Performance | |
dc.type | Journal Article | |
dcterms.source.volume | 146 | |
dcterms.source.number | 3 | |
dcterms.source.issn | 0733-9364 | |
dcterms.source.title | Journal of Construction Engineering and Management | |
dc.date.updated | 2020-05-20T01:12:27Z | |
curtin.note |
This material may be downloaded for personal use only. Any other use requires prior permission of the American Society of Civil Engineers. This material may be found at https://doi.org/10.1061/(ASCE)CO.1943-7862.0001766 | |
curtin.department | School of Design and the Built Environment | |
curtin.accessStatus | Open access | |
curtin.faculty | Faculty of Humanities | |
curtin.contributor.orcid | Chong, Heap-Yih (John) [0000-0002-6080-7530] | |
curtin.contributor.orcid | Wang, Xiangyu [0000-0001-8718-6941] | |
curtin.contributor.researcherid | Chong, Heap-Yih (John) [M-8354-2017] | |
curtin.contributor.researcherid | Wang, Xiangyu [B-6232-2013] | |
curtin.identifier.article-number | ARTN 04020008 | |
dcterms.source.eissn | 1943-7862 | |
curtin.contributor.scopusauthorid | Chong, Heap-Yih (John) [35091031600] | |
curtin.contributor.scopusauthorid | Wang, Xiangyu [35323443600] [56021280800] [57193394615] [57196469993] [57200031213] [8945580300] |