Production Scheduling of an Open-pit Mining Complex with Waste Dump Constraints
Access Status
Open access
Date
2021Supervisor
Wawar Asad
Type
Thesis
Award
MPhil
Metadata
Show full item recordFaculty
Science and Engineering
School
WASM: Minerals, Energy and Chemical Engineering
Collection
Abstract
The research work aims to solve the production scheduling problem for open pit mining complexes. It establishes a Mixed-Integer Programming (MIP) model that maximises the net present value of future cash flows and satisfies reserve, production capacity, mining block precedence, waste disposal, stockpiling, and pit sequence constraints. The model is validated and implemented with real-world case.