Show simple item record

dc.contributor.authorLin, Wei
dc.contributor.supervisorWawar Asaden_US
dc.date.accessioned2022-03-14T06:54:08Z
dc.date.available2022-03-14T06:54:08Z
dc.date.issued2021en_US
dc.identifier.urihttp://hdl.handle.net/20.500.11937/88095
dc.description.abstract

The research work aims to solve the production scheduling problem for open pit mining complexes. It establishes a Mixed-Integer Programming (MIP) model that maximises the net present value of future cash flows and satisfies reserve, production capacity, mining block precedence, waste disposal, stockpiling, and pit sequence constraints. The model is validated and implemented with real-world case.

en_US
dc.publisherCurtin Universityen_US
dc.titleProduction Scheduling of an Open-pit Mining Complex with Waste Dump Constraintsen_US
dc.typeThesisen_US
dcterms.educationLevelMPhilen_US
curtin.departmentWASM: Minerals, Energy and Chemical Engineeringen_US
curtin.accessStatusOpen accessen_US
curtin.facultyScience and Engineeringen_US
curtin.contributor.orcidLin, Wei [0000-0002-8395-5675]en_US


Files in this item

Thumbnail

This item appears in the following Collection(s)

Show simple item record