Production Scheduling of an Open-pit Mining Complex with Waste Dump Constraints
dc.contributor.author | Lin, Wei | |
dc.contributor.supervisor | Wawar Asad | en_US |
dc.date.accessioned | 2022-03-14T06:54:08Z | |
dc.date.available | 2022-03-14T06:54:08Z | |
dc.date.issued | 2021 | en_US |
dc.identifier.uri | http://hdl.handle.net/20.500.11937/88095 | |
dc.description.abstract |
The research work aims to solve the production scheduling problem for open pit mining complexes. It establishes a Mixed-Integer Programming (MIP) model that maximises the net present value of future cash flows and satisfies reserve, production capacity, mining block precedence, waste disposal, stockpiling, and pit sequence constraints. The model is validated and implemented with real-world case. | en_US |
dc.publisher | Curtin University | en_US |
dc.title | Production Scheduling of an Open-pit Mining Complex with Waste Dump Constraints | en_US |
dc.type | Thesis | en_US |
dcterms.educationLevel | MPhil | en_US |
curtin.department | WASM: Minerals, Energy and Chemical Engineering | en_US |
curtin.accessStatus | Open access | en_US |
curtin.faculty | Science and Engineering | en_US |
curtin.contributor.orcid | Lin, Wei [0000-0002-8395-5675] | en_US |