    Time and cost performance of design-build projects

    Access Status
    Fulltext not available
    Authors
    Chen, Q.
    Jin, Z.
    Xia, B.
    Wu, Peng
    Skitmore, M.
    Date
    2016
    Type
    Journal Article
    
    Metadata
    Show full item record
    Citation
    Chen, Q. and Jin, Z. and Xia, B. and Wu, P. and Skitmore, M. 2016. Time and cost performance of design-build projects. Journal of Construction Engineering and Management. 142 (2): pp. 04015074-1 - 04015074-7.
    Source Title
    Journal of Construction Engineering and Management
    DOI
    10.1061/(ASCE)CO.1943-7862.0001056
    ISSN
    0733-9364
    School
    Department of Construction Management
    URI
    http://hdl.handle.net/20.500.11937/9975
    Collection
    • Curtin Research Publications
    Abstract

    © 2015 American Society of Civil Engineers. The design-build (DB) delivery method has been widely used in the United States due to its reputed superior cost and time performance. However, rigorous studies have produced inconclusive support and only in terms of overall results, with few attempts being made to relate project characteristics with performance levels. This paper provides a larger and more finely grained analysis of a set of 418 DB projects from the online project database of the Design-Build Institute of America (DBIA), in terms of the time-overrun rate (TOR), early start rate (ESR), early completion rate (ECR), and cost overrun rate (COR) associated with project type (e.g., commercial/institutional buildings and civil infrastructure projects), owners (e.g., Department of Defense and private corporations), procurement methods (e.g., best value with discussion and qualifications-based selection), contract methods (e.g., lump sum and GMP) and LEED levels (e.g., gold and silver). The results show best value with discussion to be the dominant procurement method and lump sum the most frequently used contract method. The DB method provides relatively good time performance, with more than 75% of DB projects completed on time or before schedule. However, with more than 50% of DB projects cost overrunning, the DB advantage of cost saving remains uncertain. ANOVA tests indicate that DB projects within different procurement methods have significantly different time performance and that different owner types and contract methods significantly affect cost performance. In addition to contributing to empirical knowledge concerning the cost and time performance of DB projects with new solid evidence from a large sample size, the findings and practical implications of this study are beneficial to owners in understanding the likely schedule and budget implications involved for their particular project characteristics.

    Related items

    Showing items related by title, author, creator and subject.

    • Estimation of life-cycle costs of buildings: regression vs artificial neural network
      Alqahtani, Ayedh; Whyte, Andrew (2016)
      Purpose – The purpose of this paper is to compare the performance of regression and artificial-neural-networks (ANNs) methods to estimate the running cost of building projects towards improved accuracy. Design/methodolo ...
    • Time-cost relationships in Australian building construction projects
      Love, Peter; Tse, R.; Edwards, D. (2005)
      Project time–cost relationships were examined by using project scope factors as predictors for 161 construction projects that were completed in various Australian States using the multiple regression technique of weighted ...
    • Building cost planning for the design team: Third edition
      Jaggar, D.; Love, Peter; Smith, J.; Olatunji, O. (2016)
      Cost management of all building projects has become increasingly important as clients in the public and private sector demand the highest quality cost planning services with accurate budgeting and cost control. All members ...
    Advanced search

    Browse

    Communities & CollectionsIssue DateAuthorTitleSubjectDocument TypeThis CollectionIssue DateAuthorTitleSubjectDocument Type

    My Account

    Admin

    Statistics

    Most Popular ItemsStatistics by CountryMost Popular Authors

    Follow Curtin

    • 
    • 
    • 
    • 
    • 

    CRICOS Provider Code: 00301JABN: 99 143 842 569TEQSA: PRV12158

    Copyright | Disclaimer | Privacy statement | Accessibility

    Curtin would like to pay respect to the Aboriginal and Torres Strait Islander members of our community by acknowledging the traditional owners of the land on which the Perth campus is located, the Whadjuk people of the Nyungar Nation; and on our Kalgoorlie campus, the Wongutha people of the North-Eastern Goldfields.