Time and cost performance of design-build projects
Access Status
Authors
Date
2016Type
Metadata
Show full item recordCitation
Source Title
ISSN
School
Collection
Abstract
© 2015 American Society of Civil Engineers. The design-build (DB) delivery method has been widely used in the United States due to its reputed superior cost and time performance. However, rigorous studies have produced inconclusive support and only in terms of overall results, with few attempts being made to relate project characteristics with performance levels. This paper provides a larger and more finely grained analysis of a set of 418 DB projects from the online project database of the Design-Build Institute of America (DBIA), in terms of the time-overrun rate (TOR), early start rate (ESR), early completion rate (ECR), and cost overrun rate (COR) associated with project type (e.g., commercial/institutional buildings and civil infrastructure projects), owners (e.g., Department of Defense and private corporations), procurement methods (e.g., best value with discussion and qualifications-based selection), contract methods (e.g., lump sum and GMP) and LEED levels (e.g., gold and silver). The results show best value with discussion to be the dominant procurement method and lump sum the most frequently used contract method. The DB method provides relatively good time performance, with more than 75% of DB projects completed on time or before schedule. However, with more than 50% of DB projects cost overrunning, the DB advantage of cost saving remains uncertain. ANOVA tests indicate that DB projects within different procurement methods have significantly different time performance and that different owner types and contract methods significantly affect cost performance. In addition to contributing to empirical knowledge concerning the cost and time performance of DB projects with new solid evidence from a large sample size, the findings and practical implications of this study are beneficial to owners in understanding the likely schedule and budget implications involved for their particular project characteristics.
Related items
Showing items related by title, author, creator and subject.
-
Alqahtani, Ayedh; Whyte, Andrew (2016)Purpose – The purpose of this paper is to compare the performance of regression and artificial-neural-networks (ANNs) methods to estimate the running cost of building projects towards improved accuracy. Design/methodolo ...
-
Love, Peter; Tse, R.; Edwards, D. (2005)Project time–cost relationships were examined by using project scope factors as predictors for 161 construction projects that were completed in various Australian States using the multiple regression technique of weighted ...
-
Jaggar, D.; Love, Peter; Smith, J.; Olatunji, O. (2016)Cost management of all building projects has become increasingly important as clients in the public and private sector demand the highest quality cost planning services with accurate budgeting and cost control. All members ...