There is limited systematic knowledge available about the dynamics of rework in highway projects, despite the fact that they frequently exceed budget and schedule by more than 10%. A case study of a Spanish highway project, which experienced a significant cost overrun as a result of rework, is examined and the causal factors that contributed to its occurrence are determined. Through observation and subsequent analysis of interviews and documentation a high degree of interdependency existed between perceived causes of rework. This resulted in the nomenclature of Project, Organization and People to be adopted and used to develop the rework generic systemic model. Scope changes, high complexity, poor skill levels and unexpected underground services were found to be the most significant causes of rework. The developed model provides managers with insights about the interdependencies and behaviour between key influencing variables inhighway projects and can be used to stimulate learning and process improvements in future highway projects.
Related items
Showing items related by title, author, creator and subject.
-
Ekambaram, P.; Love, Peter; Kumaraswamy, M.; Ng, T. (2014)Purpose – Rework is an endemic problem in construction projects and has been identified as beinga significant factor contributing cost and schedule overruns. Causal ascription is necessary to obtainknowledge about the ...
-
Love, Peter; Edwards, D.; Smith, J.; Walker, D. (2009)Rework has been identified as a major contributor to cost and schedule overrun in construction projects. Previous studies that have examined rework are based on a limited data sets and thus eschew generalizations being ...
-
Love, Peter; Sing, Michael (2013)Rework arises due to design errors, changes and omissions during design and has been found to contribute to 52% of a project’s cost overrun. The statistical characteristics of rework costs experienced from contract award ...