A new open-pit mine planning optimization method using block aggregation and integer programming
Access Status
Authors
Date
2018Type
Metadata
Show full item recordCitation
Source Title
ISSN
School
Collection
Abstract
© The Southern African Institute of Mining and Metallurgy, 2018. Mathematical programming has been applied to optimizing open pit mine planning problems since the early 1960s. Nonetheless, it still remains challenging to obtain a life-of-mine plan with current computational hardware and software, mostly because of the scale of the input data, which is generally in the form of mining blocks. To overcome this challenge, one common practice is to aggregate blocks into larger units before formulating and solving mine planning models. However, the majority of available block aggregation techniques ignore the slope relation between blocks or are simply not capable of controlling the number of aggregates generated. In this study, a new optimization method for open pit mine planning is proposed, which consists of two stages. In the first stage, a new block aggregation algorithm is proposed, called the TopCone algorithm (TCA), where blocks are clustered into TopCones (TCs), which have two important features: (1) the cone shape and (2) the number of TCs that can be explicitly controlled. In the second stage, TCs form the basis of an integer programming model with a variety of operational constraints so that a high-quality production scheduling solution can be obtained in relatively quick computational time. The capability and novelty of the proposed method is demonstrated through the optimization of the long-term production schedule of a large-scale copper deposit. The case study shows higher NPV results compared to a commercial software package, and the entire mine planning process can be completed in less than 10 minutes.
Related items
Showing items related by title, author, creator and subject.
-
Ren, H.; Topal, Erkan (2014)Typical mine planning process includes creating a mining block model, applying the ultimate pit limit analysis and creating mining cuts for production scheduling. Mixed integer linear programming (MILP) has been used ...
-
Chung, J.; Asad, Mohammad ; Topal, Erkan ; Ghosh, Apurna (2016)Many open pit (OP) mines with considerable vertical extent are approaching towards the end of their life-of-mine (LOM), and some of them are seeking the opportunity to make the transition from OP to underground (UG) mining. ...
-
Little, J; Knights, P; Topal, Erkan (2013)It is common practice for underground mine plans to be created sequentially, where results from one planning process form the input data for another. While this is practical for manual methods, computerized optimization ...