dc.contributor.authorMai, N.
dc.contributor.authorTopal, Erkan
dc.contributor.authorErten, Oktay
dc.date.accessioned2018-12-13T09:16:42Z
dc.date.available2018-12-13T09:16:42Z
dc.date.created2018-12-12T02:46:46Z
dc.date.issued2018
dc.identifier.citationMai, N. and Topal, E. and Erten, O. 2018. A new open-pit mine planning optimization method using block aggregation and integer programming. Southern African Institute of Mining and Metallurgy. Journal. 118 (7): pp. 705-714.
dc.identifier.urihttp://hdl.handle.net/20.500.11937/73501
dc.identifier.doi10.17159/2411-9717/2018/v118n7a4
dc.description.abstract

© The Southern African Institute of Mining and Metallurgy, 2018. Mathematical programming has been applied to optimizing open pit mine planning problems since the early 1960s. Nonetheless, it still remains challenging to obtain a life-of-mine plan with current computational hardware and software, mostly because of the scale of the input data, which is generally in the form of mining blocks. To overcome this challenge, one common practice is to aggregate blocks into larger units before formulating and solving mine planning models. However, the majority of available block aggregation techniques ignore the slope relation between blocks or are simply not capable of controlling the number of aggregates generated. In this study, a new optimization method for open pit mine planning is proposed, which consists of two stages. In the first stage, a new block aggregation algorithm is proposed, called the TopCone algorithm (TCA), where blocks are clustered into TopCones (TCs), which have two important features: (1) the cone shape and (2) the number of TCs that can be explicitly controlled. In the second stage, TCs form the basis of an integer programming model with a variety of operational constraints so that a high-quality production scheduling solution can be obtained in relatively quick computational time. The capability and novelty of the proposed method is demonstrated through the optimization of the long-term production schedule of a large-scale copper deposit. The case study shows higher NPV results compared to a commercial software package, and the entire mine planning process can be completed in less than 10 minutes.

dc.publisherSouthern African Institute of Mining and Metallurgy
dc.titleA new open-pit mine planning optimization method using block aggregation and integer programming
dc.typeJournal Article
dcterms.source.volume118
dcterms.source.number7
dcterms.source.startPage705
dcterms.source.endPage714
dcterms.source.issn2225-6253
dcterms.source.titleSouthern African Institute of Mining and Metallurgy. Journal
curtin.departmentWASM: Minerals, Energy and Chemical Engineering (WASM-MECE)
curtin.accessStatusFulltext not available